Section 3 • Scheduled Maintenance Procedures

Checklist C Procedures

C-1
Perform Engine Maintenance -
Deutz Models
Engine specifications require that this procedure be
performed every 500 hours.
Proper engine maintenance, following the engine
manufacturer's maintenance schedule, is essential
to good engine performance and service life. Failure
to perform the maintenance procedures can lead to
poor engine performance and component damage.
Required maintenance procedures and additional
engine information are available in the
Deutz 2011 Series Operation Manual
(Deutz part number 0312-3547).
Deutz 2011 Series Operation Manual
Genie part number
3 - 42
C-2
Grease the Platform Overload
Mechanism (if equipped), S-60,

S-65, S-60 TRAX and S-65 TRAX

Genie specifications require that this procedure be
performed every 500 hours or six months,
whichever comes first. Perform this procedure more
often if dusty conditions exist.
Application of lubrication to the platform overload
mechanism is essential to safe machine operation.
Continued use of an improperly greased platform
overload mechanism could result in the system not
sensing an overloaded platform condition and will
result in component damage.
1 Locate the grease fittings on each pivot pin of
139320
2 Thoroughly pump grease into each grease
Grease Specification
Chevron Ultra-duty grease, EP NLGI 2 (lithium based)
or equivalent
S-60 • S-65 • S-60 TRAX • S-65 TRAX
S-60 HC • S-60X • S-60XC
the platform overload assembly.
fitting.
December 2013
Part No. 147753