Jib Boom Lift Cylinder - Genie S-60 TraX Service Manual

Hide thumbs Also See for S-60 TraX:
Table of Contents

Advertisement

December 2013
3-2

Jib Boom Lift Cylinder

How to Remove the Jib Boom
Lift Cylinder
Note: Perform this procedure with the boom in the
stowed position.
Note: When removing a hose assembly or fitting,
the O-ring (if equipped) on the fitting and/or the
hose end must be replaced. All connections must
be torqued to specification during installation. Refer
to Section 2, Hydraulic Hose and Fitting Torque
Specifications .
1 Raise the jib boom slightly and place blocks
under the platform mounting weldment. Then
lower the jib boom until the platform is resting
on the blocks just enough to support the
platform.
Note: Do not rest the entire weight of the boom on
the blocks.
2 Tag, disconnect and plug the jib boom lift
cylinder hydraulic hoses. Cap the fittings on the
cylinder.
Bodily injury hazard. Spraying
hydraulic oil can penetrate and
burn skin. Loosen hydraulic
connections very slowly to allow
the oil pressure to dissipate
gradually. Do not allow oil to
squirt or spray.
Part No. 147753
JIB BOOM COMPONENTS, S-65 AND S-65 TRAX
3 Remove the pin retaining fasteners from the jib
4 Use a soft metal drift to tap the jib boom lift
5 Support the jib boom lift cylinder with a lifting
6 Remove the pin retaining fastener from the jib
7 Attach a lifting strap from an overhead crane to
8 Use a soft metal drift to remove the jib boom lift
S-60 • S-65 • S-60 TRAX • S-65 TRAX
S-60 HC • S-60X • S-60XC
Section 4 • Repair Procedures
boom lift cylinder rod-end pivot pin. Do not
remove the pin.
cylinder rod-end pivot pin half way out. Then
lower one of the leveling arms to the ground.
Tap the pin the other direction and lower the
opposite leveling arm. Do not remove the pin.
device.
boom lift cylinder barrel-end pivot pin. Use a
soft metal drift to remove the barrel-end pin and
let the cylinder hang down.
Crushing hazard. The platform and
jib boom could become unbalanced
and fall when the jib boom barrel-
end pivot pin is removed if not
properly supported.
the lug on the rod end of the jib boom lift
cylinder.
cylinder rod-end pin. Remove the cylinder from
the machine.
Crushing hazard. The jib boom lift
cylinder could become unbalanced
and fall when removed from the
machine if not properly attached to
the overhead crane.
4 - 19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S-65 traxS-60xS-60xc

Table of Contents