Genie S-60 TraX Service Manual page 90

Hide thumbs Also See for S-60 TraX:
Table of Contents

Advertisement

Section 3 • Scheduled Maintenance Procedures
CHECKLIST C PROCEDURES
Platform controls:
Note: Start this procedure with the boom fully
retracted and in the stowed position.
1 Pull out the red Emergency Stop button to the
on position and start the engine.
2 Select the restricted maximum platform capacity
with the toggle switch.
a
1000 lbs /
454 kg
a
restricted maximum platform
capacity
b
unrestricted maximum platform
capacity
3 Raise the primary boom until it is fully elevated.
4 Extend the primary boom until it is fully
extended.
3 - 52
b
500 lbs /
227 kg
S-60 • S-65 • S-60 TRAX • S-65 TRAX
S-60 HC • S-60X • S-60XC
5 Lower the primary boom until it stops.
Result: The boom will automatically stop after
10 degrees and the unrestricted platform
capacity light will flash.
Result: The primary boom does not stop after 10
degrees. Calibrate the boom angle sensor. Refer
to Repair Procedure 1-2, How to Calibrate the
Boom angle Sensor.
6 Move the primary boom down joystick off center
and retract the primary boom until the
unrestricted platform capacity light stops
flashing.
Result: Primary boom down should return to
normal operation.
7 Lower the primary boom 5 feet / 1.5 m and
activate primary boom extend.
Result: Primary boom extend will stop and the
unrestricted platform capacity light will start
flashing.
8 Activate primary boom extend and raise the
primary boom until the unrestricted platform
capacity light stops flashing.
Result: Primary boom extend should return to
normal operation.
9 Return the machine to the fully stowed position.
December 2013
Part No. 147753

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S-65 traxS-60xS-60xc

Table of Contents