Final Gear Construction - Suzuki kq750 Service Manual

Table of Contents

Advertisement

3B-22 Differential:

Final Gear Construction

1. Shim (Left side)
2. Shim (Right side)
3. Pinion gear shim(s)
4. Pinion gear nut
5. Final drive bearing stopper
6
(b)
5
(b)
4
(b)
"A"
1
(a)
"A"
6. Lock-nut
"A": Matching surface
: 26 N⋅m (2.6 kgf-m, 19.0 lb-ft)
: 100 N⋅m (10.0 kgf-m, 72.5 lb-ft)
: Apply grease.
3
2
2
: Apply water resistance grease.
: Apply thread lock to thread part.
: Apply bond.
: Apply molybdenum oil solution.
B831G23206013
I831G1320081-04

Advertisement

Table of Contents
loading

Table of Contents