Eps Motor Inspection (Lt-A750Xp/Zk9) - Suzuki kq750 Service Manual

Table of Contents

Advertisement

6C-53 Power Assisted Steering System:
• Install the handlebar holder (8) and tighten the nuts to
the specified torque.
Tightening torque
Handlebar holder nut (e): 60 N·m (6.0 kgf-m, 43.5
lbf-ft)
8
• Install the center cover (9).
11
11
"A"
9. Center cover
10. Wiring harness (Left handlebar switch/Parking rear brake switch/
Parking rear brake light switch), (Emergency switch (For P-17) and
horn switch (For P-17, 24))
11. Parking/Rear brake cable
12. Steering shaft
"A": Hooked point
• Install the auxiliary headlight. Refer to "Auxiliary
Headlight Removal and Installation in Section 9B in
related manual".
• Install the front fender. Refer to "Front Side Exterior
Parts Removal and Installation in Section 9D in
related manual".
• Install the handlebars. Refer to "Handlebars Removal
and Installation (LT-A750XP/ZK9) in Section 6B
(Page 6B-3)".
• Install the combination meter. Refer to "Combination
Meter Removal and Installation in Section 9C in
related manual".
(e)
I931G3630063-02
10
9
I931G3630064-02

EPS Motor Inspection (LT-A750XP/ZK9)

1) Disconnect the EPS motor coupler.
2) First, check for insulation with the tester between
terminals "A" and "B".
If continuity does not exist, replace the EPS body
assembly with a new one.
Special tool
(A): 09900–25008 (Multi circuit tester set)
Tester knob indication
Continuity (
)
3) Next, check for insulation with the tester between
terminal "A" and body ground "C" and terminal "B"
and body ground "C".
If continuity is found, replace the EPS body
assembly with a new one.
Special tool
(A): 09900–25008 (Multi circuit tester set)
Tester knob indication
Continuity (
)
B931G46306005
(A)
"B"
"A"
I931H1630107-02
"C"
"B"
"A"
(A)
I931H1630108-02

Advertisement

Table of Contents
loading

Table of Contents