Scheduling An Activity - Promise Technology VTRAK E610f Product Manual

E-class
Hide thumbs Also See for VTRAK E610f:
Table of Contents

Advertisement

Scheduling an Activity

To set a scheduled activity for this subsystem:
1.
Click the Subsystem
2.
From the dropdown menu on the Scheduler tab, choose an item:
Media Patrol. See "Running Media Patrol" on page 68
Redundancy Check. See "Running Redundancy Check" on page 137
Battery Reconditioning. See "Reconditioning a Battery" on page 114
Spare Drive Check. See "Running Spare Check" on page 144
3.
In the Scheduler dialog box, check the Enable This Schedule box.
4.
Select a start time (24-hour clock).
5.
Select a Recurrence Pattern.
Daily – Enter the number of days between events.
Weekly – Enter the number of weeks between events and select which
days of the week.
Monthly – Select a calendar day of the month (1 – 31).
If you select a higher number than there are days in the current month, the
actual start date will occur at the beginning of the following month.
Or, select a day of the week and select the first, second, third, fourth, or last
occurrence of that day in the month.
Then, select the months in which you want the activity to occur.
6.
Select a Range of Occurrence.
Start-from date. The default is today's date.
End-on date.
Select No End Date (perpetual).
Or, select a number of occurrences for this activity.
Or, select a specific end date. The default is today's date.
7.
For Redundancy Check only:
Choose the Auto Fix option. This feature attempts to repair the problem
when it finds an error.
•Choose the Pause on Error option. This feature stops the process when it
finds an error
Check the boxes beside the logical drives (all except RAID 0) to which
this activity will apply.
Each logical drive can have only one scheduled Redundancy Check.
Chapter 4: Management with WebPAM PROe
icon Tree View.