Viewing Scheduled Activities
To view scheduled activities for this subsystem:
1.
Click the Subsystem
2.
Click the Scheduler tab in Management View.
Scheduling an Activity
To set a scheduled activity for this subsystem:
1.
Click the Subsystem
2.
From the dropdown menu on the Scheduler tab, choose an item:
•
Media Patrol. See "Running Media Patrol" on page 71
•
Redundancy Check. See "Running Redundancy Check" on page 155
•
Battery Reconditioning. See "Reconditioning a Battery" on page 128
•
Spare Drive Check. See "Running Spare Check" on page 162
3.
In the Scheduler dialog box, check the Enable This Schedule box.
4.
Select a start time (24-hour clock).
5.
Select a Recurrence Pattern.
•
Daily – Enter the number of days between events.
•
Weekly – Enter the number of weeks between events and choose
which days of the week.
•
Monthly – Choose a calendar day of the month (1 – 31).
If you choose a higher number than there are days in the current month, the
actual start date will occur at the beginning of the following month.
Or, choose a day of the week and choose the first, second, third, fourth, or
last occurrence of that day in the month.
Then, choose the months in which you want the activity to occur.
6.
Select a Range of Occurrence.
•
Start-from date. The default is today's date.
•
End-on date.
Select No End Date (perpetual).
Or, choose a number of occurrences for this activity.
icon Tree View.