Promise Technology VTRAK E610f Product Manual page 163

E-class
Hide thumbs Also See for VTRAK E610f:
Table of Contents

Advertisement

Chapter 5: Management with the CLU
Figure 4. The CLU main menu
Quick Setup – A sequence of four steps to setup System Date & Time,
Management Port, and RAID Configuration.
Subsystem Management – View controller information, lock/unlock the
controller, set date and time, and monitor the enclosure.
Physical Drive Management – View disk drive assignments and parameters,
change disk drive cache settings and command queuing, and locate a physical
drive.
Disk Array Management – View disk array information, create and delete disk
arrays, transport, rebuild, PDM, and transition functions, and locate a disk array,
create and delete logical drives.
Logical Drive Management – View logical drive information, name logical
drives, initialization and redundancy check, and locate a logical drive.
Network Management – Set IP addresses for Management Port, gateway, and
DNS server; subnet mask.
Fibre Channel Management – Node information, Port information, settings and
statistics, list of logged-in devices, list of initiators.
SAS Management – Node information, Port information, settings, status, and
statistics; SFP information, list initiators.
149

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vtrak e310fVtrak e610sVtrak e310s

Table of Contents