Bench Installation; Rack Installation; 400 Hz Operation - Agilent Technologies N6705 User Manual

Dc power analyzer
Table of Contents

Advertisement

2 Installation

Bench Installation

CAUTION

Rack Installation

CAUTION

400 Hz Operation

32
Do not block the air intake and exhaust at the sides, or the exhaust at the
rear of the unit. Refer to the outline diagram in Appendix A.
Minimum clearances for bench operation are 2 inches (51 mm) along
the sides and back.
For easier display viewing and binding post access, you can tilt the
front of the unit up by rotating the extension bar down.
Use Rack Mount kit (Option 908 or Option 909 with handles) to rack mount the
instrument. Installation instructions are provided with the rack mount kit.
Agilent N6705 DC Power Analyzer mainframes can be mounted in a
19-inch EIA rack cabinet. They are designed to fit in four rack-units
(4U) of space.
Remove the feet before rack mounting the unit. Do not block the air
intake and exhausts at the sides and rear of the unit.
Redundant Ground Requirement
At 400 Hz AC input operation, the leakage current of the unit exceeds
3.5 mA. This requires the installation of a permanent, redundant
ground from the instrument chassis to earth ground. This ensures
that ground will always be connected and that any leakage current
will be diverted to ground. Refer to the "Connecting the BNC
Connectors" later in this chapter for installation instructions.
Power Factor
Refer to Appendix A for power factor statistics at 400 Hz operation.
Model N6705 User's Guide

Advertisement

Table of Contents
loading

Table of Contents