Cisco WS-C6506 Software Manual page 508

Catalyst 6500 series switch
Hide thumbs Also See for WS-C6506:
Table of Contents

Advertisement

Configuring Policy-Based Forwarding
Configure one PBF gateway called GATEWAY-TEST.
Step 3
Console> (enable) set pbf gw GATEWAY-TEST 10.0.0.100 255.255.255.0 11-11-22-22-33-3 3 1
Commit operation successful.
Console> (enable)
The following PBF gateway has been created:
Console> (enable) show pbf gw
Name
Map
VLAN
Gateways
Adjacency
----------------------------------------------------------------
.g0001GATEWAY-TEST 10.0.0.100
Console> (enable)
The set pbf gateway command macro has created the security ACL adjacency for the gateway, but the
macro command (set pbf client GATEWAY-TEST 10.0.0.100 255.255.255.0 11-11-22-22-33-33 1) that
created the security ACL adjacency does not appear in the following configuration:
Console> (enable) show run
<SNIP>
!
#security ACLs
clear security acl all
#pbf set
set pbf mac 00-0d-65-36-1e-eb
#adj set
set security acl adjacency .c0000CLIENT-TEST 10 00-00-11-11-22-22 10.0.0.10
set security acl adjacency .g0001GATEWAY-TEST 1 11-11-22-22-33-33 10.0.0.100 23
#
commit security acl all
!
<SNIP>
Console> (enable)
Build the PBF map between the client (CLIENT-TEST) and the gateway (GATEWAY-TEST).
Step 4
Console> (enable) set pbf-map CLIENT-TEST GATEWAY-TEST
.cCLIENT-TEST editbuffer modified. Use 'commit' command to apply changes.
.cCLIENT-TEST editbuffer modified. Use 'commit' command to apply changes.
.gGATEWAY-TEST editbuffer modified. Use 'commit' command to apply changes.
.cCLIENT-TEST editbuffer modified. Use 'commit' command to apply changes.
.gGATEWAY-TEST editbuffer modified. Use 'commit' command to apply changes.
6509> (enable) ACL commit in progress.
ACL commit in progress.
ACL '.cCLIENT-TEST' successfully committed.
Console> (enable)
ACL '.gGATEWAY-TEST' successfully committed.
Console> (enable) Mapping in progress.
Please configure VLAN 10.
ACL .cCLIENT-TEST successfully mapped to VLAN 10.
Console> (enable) Mapping in progress.
ACL .gGATEWAY-TEST successfully mapped to VLAN 1.
Catalyst 6500 Series Switch Software Configuration Guide—Release 8.7
15-112
: GATEWAY-TEST
: CLIENT-TEST,
: 1
: 1
ip
Unrelated configuration information cut out
Unrelated configuration information cut out
mask
mac
255.255.255.0 11-11-22-22-33-33
Chapter 15
Configuring Access Control
OL-8978-04

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 6506Catalyst 6509Catalyst 6513

Table of Contents