Sinexcel SVG 100 Ultra User Manual page 41

Ultra static var generator
Table of Contents

Advertisement

Cabinet connection notice:
WARNING
Must be performed by qualified engineers.
WARNING
Before wiring, make sure the switch in distribution room of SVG system
input power and city power are in "off" state, and warning label is
attached to prevent any other person from handling the switch.
NOTICE
Confirm all input distribution power switches are completely off
NOTICE
Connect protective grounding and other necessary ground cables to
earth point PE; all SVG cabinets must be connected to user grounding.
WARNING
Earth wire connection must comply with international relevant
standards.
WARNING
Failure to conduct ground installation according to requirement may
lead to electromagnetic interference, electric shock and fire.
41

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SVG 100 Ultra and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF