Chapter Ii Installation And Wiring; Pre-Installation Notice; Environment Requirements - Sinexcel SVG 100 Ultra User Manual

Ultra static var generator
Table of Contents

Advertisement

CHAPTER II INSTALLATION AND WIRING

2.1 PRE-INSTALLATION NOTICE

2.2 ENVIRONMENT REQUIREMENTS

Before proceeding, it is important to take note of the preconditions required for the environment.
CAUTION
The installation, assembly and power on of the module must be
operated by qualified personnel or supervised by qualified personnel
on-site.
CAUTION
Before wiring or connecting terminals, make sure that the input of the
SVG has been turned off so as to avoid accidents.
CAUTION
This equipment has the leakage current from 3.5mA to 1000mA. Before
connecting power supply, the user must make sure the equipment is
properly grounded.
When choosing RCCB or RCD equipment, the leakage current of the
module should be considered.
The RCCB chosen should not be sensitive to the unidirectional DC
pulse (Class A) and the transient pulse.
Please note that the leakage current of the load will also flow through
RCCB or RCD; the grounding of the device must meet the local
electrical regulations
CAUTION
Sinexcel Ultra SVG should be installed in a clean, well-ventilated indoor
environment.
ATTENTION
The cold air enters SVG through the front grid of the module and hot air
is discharged through the rear grid of the module. Do not block the
ventilation holes on either side and clean the front grid every 3 months
to prevent blockage by dust.
26

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SVG 100 Ultra and is the answer not in the manual?

Table of Contents

Save PDF