We will now build the front sides. It is the same process as before, noting that the arrows on
the wood sides point towards the rear of the cabinet.
- Remove the next board from the pallet stack and place on the floor.
- Locate 2 sets of bolts, spilt washers, and
washers from the hardware kit.
- Unwrap one of the Short Legs part # A5ME22008 and place one
against the left front side wall.
- Hand thread the bolt, split washer, washers into side wall and tighten using a 9/16" wrench.
- Remove the next board from the pallet stack and place on the floor.
- Locate 2 sets of bolts, spilt washers, and
washers from the hardware kit.
- Unwrap one of the Short Legs part # A5ME22008 and place one
against the right front side wall.
- Hand thread the bolt, split washer, washers into
side wall and tighten using a 9/16" wrench.
- Bring both front side walls to the cabinet.
- Locate 12 black bolts from the hardware kit.
- Using 2 people, place one front section into
position. Make sure the arrows point toward the rear
of the cabinet.
- Hand thread the 6 bolts into the holes of the
connection plate.
- Using 2 people, place the other front section into
position.
- Hand thread the 6 bolts into the holes of the connection plate.
- All 12 of these bolts on both sides can now be tightened using a # 2 square bit.
A5BOPH312
A5BOHH090
A5BOHH090
19
A5WALO010
A5WAFL050
A5WALO010
A5WAFL050