9.
Set remote control lever
free acceleration lever
10.
Set shift arm
to forward (F), neutral (N), reverse (R)
and then to neutral (N) positions.
11.
Run remote control cable
like throttle cable, bring nut
When adjusting position of cable joint, push in
remote control cable to remove any play.
12.
Screw on cable joint
nut
.
13.
Lock cable joint with nut
with washer and snap pin.
3-24
to neutral (N), and check that
is at full close position
(shift side) into grommet, and
of cable to position of joint
to position of remote control cable
, attach it to pin, and then, fix
.
Full open
Full close
.
4st 8/9.8 2016