Download Print this page

TOHATSU MFS 8B Service Manual page 162

4 stroke
Hide thumbs Also See for MFS 8B:

Advertisement

1.
With power unit and recoil starter attached, put power head
ass'y
upside down on the work bench, and install plunger
and oil strainer
Complete this work in a short period. Doing this
work for long time can cause engine oil to flow
from breather pipe.
Plunger :
30 N · m (22 lb · ft) [3.0 kgf · m]
1.
Hoist power unit with rope as shown.
2.
Clean surface of power unit that contacts with the engine
base, and install dowel pin
3.
Install power unit
, and tighten bolts
to specified torque.
Be careful not to catch wires and hoses and other
parts between power unit and engine base.
Power Unit Installation Bolt :
First Tightening Torque : 12 N · m (9 lb · ft) [1.2 kgf · m]
Second Tightening Torque : 23.5 N · m (17 lb · ft) [2.4 kgf · m]
4.
Attach drive shaft housing cover
5.
Install other parts by reversing the procedure described in
"Chapter 5 Removing Power Unit".
5-58
.
and new gasket
.
in two or three steps
.
4
1
6
5
2
3
4st 8/9.8 2016

Advertisement

loading

This manual is also suitable for:

Mfs 9.8b