11. While holding Jam Handling Lever, lower Transfer Guide.
12. Close Front Upper Cover.
■ Preparation for Installation on Upstream Machine
● Connecting to the Host Machine
1. Remove the 2 face covers.
NOTE:
The Buffer Pass Unit must be installed before installing this Equipment.
• 2 Claws
650
6. Paper Output Options