Installing Options and Accessories
4.
Remove the UPS cabinet top interface conduit landing plates to drill or punch conduit holes (see
5.
Reinstall the conduit landing plate.
6.
Install conduit between the UPS and RMP II. See
7.
Install wiring between the UPS and RMP II. See
Bridge Card terminal location and wiring information, and
terminal location and wiring information.
NOTE
8.
Install 120 Vac power wiring from the critical bus to the RMP II. See
the terminal location and wiring information.
9.
Close the front door and secure the latch.
10. Restart the UPS. See
Figure 54. Remote Monitor Panel II and Remote Monitor Panel II Terminal Locations
Terminal TB1
Signal Connections
from the UPS
100
Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201764—Rev 14
120 Vac for the RMP II should be supplied from the critical bus by facility planners or the
customer.
Chapter 7 UPS Operating Instructions
Figure 59
for RMP II knockout hole location.
Figure 49
and
Table 23
for the Powerware Hot Sync CAN
Figure
54,
Figure
55, and
Figure
54,
for startup instructions.
Ground
Terminal
Terminal TB3
120 Vac Power
Figure
31).
Table 27
for the RMP II
Figure
55, and
Table 27
for