Read and understand the following notes while planning and performing the wiring installation:
Conduit must be installed between the UPS cabinet and the device for signal wiring. Conduit must be
installed between the device and the power source for power wiring. Install the signal wiring in separate
conduit from the power wiring.
Conduit and wiring between the UPS and the device are to be supplied by the customer.
Maximum distance between the UPS cabinet and the device is not to exceed 150 meters (500 feet).
Use Class 1 wiring methods (as defined by the NEC) for interface and power wiring from 30 to 600V.
Use Class 2 wiring methods (as defined by the NEC) for interface and power wiring up to 30V. The wire
should be rated at 24V, 1A minimum.
Signal wiring should be a minimum of 22 AWG and a maximum of 14 AWG. The wire should be shielded
twisted pair, rated for 5A maximum. Power wiring should be a minimum of 22 AWG and a maximum of 14
AWG. The wire should be rated for 1A minimum.
Use only 75°C copper wire.
120 Vac for the RMP II, RIM II, or SCM II should be provided from the critical bus by facility planners or the
customer.
Install wiring the optional accessories in accordance with the following paragraphs:
Powerware Hot Sync CAN Bridge card (see paragraph
5.1 Installing an Optional Powerware Hot Sync CAN Bridge
Distributed Bypass Control Wiring (see paragraph
RMP II (see paragraph
RIM II (see paragraph
SCM II (see paragraph
5 5 . . 1 1
I I n n s s t t a a l l l l i i n n g g a a n n O O p p t t i i o o n n a a l l P P o o w w e e r r w w a a r r e e H H o o t t S S y y n n c c C C A A N N B B r r i i d d g g e e C C a a r r d d
As an option, a Powerware Hot Sync Controller Area Network (CAN) Bridge Card, shown in
installed to provide connectivity for operational mode control of a parallel system. In addition, this card can be
used to connect optional system monitoring devices, such as a Remote Monitor Panel II, a Relay Interface
Module II, or a Supervisory Contact Module II to the UPS.
5.2 Installing Distributed Bypass Control
5.4 Installing an Optional Relay Interface Module
5.5 Installing an Optional Supervisory Contact Module
Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201764—Rev 14
Card)
5.2 Installing Distributed Bypass Control
Wiring)