Table 10. Bonding Requirements for the Three UPM Power Xpert 9395-1100/650, 9395-1100/750, and 9395-1100/825
Basic Unit Rating
Input and Output Voltage
Neutral Bonding Jumper (Four Wire Output
Only)
Minimum Conductor Size
Number per Phase
Table 11. UPS Intercabinet Power Cable Terminations for the Four UPM Power Xpert 9395-1100/1000 and 9395-1100/1100,
and the Three UPM Power Xpert 9395-1100/650, 9395-1100/750, and 9395-1100/825
Terminal Function
AC Input to UPM Section
AC Output from UPM Section
DC Input to UPM Section
Units
kVA
kW
Volts
AWG or kcmil
(each)
Terminal
E1A (UPM 1)
E1A (UPM 2)
E1A (UPM 3)
E1A (UPM 4 – Four UPM Model)
E2A (UPM 1)
E2A (UPM 2)
E2A (UPM 3)
E2A (UPM 4 – Four UPM Model)
E3A (UPM 1)
E3A (UPM 2)
E3A (UPM 3)
E3A (UPM 4 – Four UPM Model)
E9A (UPM 1)
E9A (UPM 2)
E9A (UPM 3)
E10A (UPM 1)
E10A (UPM 2)
E10A (UPM 3)
E11A (UPM 1)
E11A (UPM 2)
E11A (UPM 3)
E12A (UPM 1)
E12A (UPM 2)
E12A (UPM 3)
1E4A (UPM 1)
2E4A (UPM 2)
3E4A (UPM 3)
1E5A (UPM 1)
2E5A (UPM 2)
3E5A (UPM 3)
Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201764—Rev 14
UPS Installation Plan and Unpacking
Rating 50/60 Hz
650
650
750
592
592
683
400/400 480/480 400/400 480/480 400/400 480/480
250
(1)
Bus Landings
Function
3 – stud mounting
Phase A
3 – stud mounting
Phase B
3 – stud mounting
Phase C
3 – stud mounting
Phase A
3 – stud mounting
Phase B
3 – stud mounting
Phase C
3 – stud mounting
Neutral
6 – stud mounting (2
Positive
per UPM)
6 – stud mounting (2
Negative
per UPM)
750
825
825
683
751
751
Tightening
Torque Nm
Stud
(lb ft)
14.2 (10.4)
M8
14.2 (10.4)
M8
14.2 (10.4)
M8
14.2 (10.4)
M8
14.2 (10.4)
M8
14.2 (10.4)
M8
14.2 (10.4)
M8
14.2 (10.4)
M8
14.2 (10.4)
M8