Eaton Power Xpert 9395 Installation And Operation Manual page 179

Ups 1000-1100 kva, for use with three upm 650-825 kva and four upm 1000-1100 kva ups
Hide thumbs Also See for Power Xpert 9395:
Table of Contents

Advertisement

UPS Operating Instructions
2.
On the System Status screen, select either the UPS or the BYPASS command.
3.
Press the CONTROLS pushbutton on the System Status menu bar. The UPS or Bypass Control Command
screen is displayed.
4.
On the Control Command screen, select LOAD OFF.
5.
Press the SELECT pushbutton on the Command menu bar.
The Load Off screen is displayed, providing a choice to proceed or abort the shutdown.
NOTE
6.
To shut down the UPS, press LOAD OFF from the Load Off menu bar, and hold for three seconds. To
abort the shutdown, press CANCEL.
When LOAD OFF is selected and held for three seconds, the input, output, battery, and bypass backfeed
contactors open, and the power module is turned off.
Do not attempt to restart the system after the Load Off until the cause of the shutdown has been identified and
cleared.
7.
To restart the UPS after pressing the LOAD OFF pushbutton, follow the procedure in paragraph
7.3.1 Starting the UPS in Online Mode
Power is present inside the UPS cabinet until the upstream input feeder circuit breaker is opened.
7 7 . . 3 3 . . 2 2 5 5 U U s s i i n n g g t t h h e e R R e e m m o o t t e e E E m m e e r r g g e e n n c c y y P P o o w w e e r r - - o o f f f f S S w w i i t t c c h h
A UPS emergency power-off is initiated by the REPO pushbutton switch. In an emergency, you can use this
switch to control the UPS output. The REPO switch de–energizes the critical load and powers down the UPS
immediately, without asking for verification.
The UPS, including Bypass, remains off until restarted.
All power to the critical load is lost when the REPO switch is activated in the following step. You should use
this feature only when you want to de–energize the critical load.
NOTE
To use the REPO switch:
1.
Firmly push the red pushbutton until it locks into place. The switch latches into the activated state (see
Figure
The input, output, and bypass backfeed contactors open, the battery breaker or disconnect is tripped, and
the power module is turned off immediately, without asking for verification.
158
Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201764—Rev 14
All power to the critical load is lost when the LOAD OFF is selected in the following
step. You should use this feature only when you want to de–energize the critical load.
The following instructions are for the Eaton-supplied REPO switch. If a customer-
supplied REPO switch is used, it may not activate in the same manner; refer to the
operating instructions provided with the switch.
86).
or
7.3.8 Starting the UPS in Bypass
Mode.