Eaton Power Xpert 9395 Installation And Operation Manual page 123

Ups 1000-1100 kva, for use with three upm 650-825 kva and four upm 1000-1100 kva ups
Hide thumbs Also See for Power Xpert 9395:
Table of Contents

Advertisement

Installing Options and Accessories
5 5 . . 4 4
I I n n s s t t a a l l l l i i n n g g a a n n O O p p t t i i o o n n a a l l R R e e l l a a y y I I n n t t e e r r f f a a c c e e M M o o d d u u l l e e I I I I
To install RIM II wiring:
1.
Verify the UPS system is turned off and all power sources are removed. See
Chapter 7 UPS Operating Instructions
2.
Perform the procedure listed in paragraph
5.1 Installing an Optional Powerware Hot Sync CAN Bridge
NOTE
3.
Securely mount the RIM II at the desired location. See
NOTE
4.
Remove the UPS cabinet top interface conduit landing plates to drill or punch conduit holes (see
5.
Reinstall the conduit landing plate.
6.
Install conduit between the UPS and RIM II. See
7.
Install wiring between the UPS and RIM II. See
Bridge Card terminal location and wiring information, and
terminal location and wiring information.
NOTE
8.
Install 120 Vac power wiring from the critical bus to the RIM II. See
the terminal location and wiring information.
9.
Close the front door and secure the latch.
10. Restart the UPS. See
NOTE
11. Contact an Eaton service representative for verification and testing of the RIM II and its connections prior
to making connections with J1 through J4 (see
You can order interface cables separately for connecting to the 15–Pin D–Sub Connectors.
Table 28. J1 through J4 Interface Connectors
Status
UPS AVAILABLE
UPS OFFLINE
BATTERY WEAK
UTILITY FAILURE
102
Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201764—Rev 14
for shutdown instructions.
If mounting to a hollow wall, secure the enclosure to a wood or metal stud within the
wall. Do not use hollow wall anchors.
When installing signal wiring for CAN card J3 terminals, conduit must be installed
between the device and the UPS cabinet.
120 Vac for the RIM II should be supplied from the critical bus by facility planners or the
customer.
Chapter 7 UPS Operating Instructions
Setup of the Powerware Hot Sync CAN Bridge Card must be performed by an
authorized Eaton Customer Service Engineer. Contact an Eaton service representative
to schedule a date.
J1 through J4
Description
Pins 1 and 12
Contacts are closed when the UPS is operating in Online mode or ready to
supply the load.
Pins 3 and 13
Contacts are open when the UPS is offline. Contacts are closed when the UPS
is operating in Online mode.
Pins 5 and 14
Contacts are closed when approximately two minutes of battery time remains
before the critical load is lost.
Pins 6 and 15
Contacts are closed when Utility Failure is detected.
Card.
Figure 60
for mounting hole locations.
Figure 60
for RIM II knockout hole location.
Figure 49
and
Table 23
for the Powerware Hot Sync CAN
Figure
54,
Figure
Figure
for startup instructions.
Table 28
and
Figure
56).
Figure
55, and
Table 27
for the RIM II
54,
Figure
55, and
Table 27
31).
for

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power xpert 9395p

Table of Contents