neutral terminals in the ISBM section. See paragraph
wiring and termination requirements.
8.
If wiring a distributed bypass system, proceed to Step 9; otherwise, proceed to Step 11.
9.
Using hardware from the external wiring terminal hardware kit (see
and Neutral power wiring from the output and neutral terminals of each UPS unit to the customer-supplied
tie cabinet or load distribution panel. See paragraph
and termination requirements.
10. Proceed to paragraph
4.8.2 Battery Power
11. Using hardware from the external wiring terminal hardware kit (see
and Neutral (if required) power wiring from output terminals and neutral terminals to the critical load. See
paragraph
3.2.4 UPS System Power Wiring
12. Proceed to paragraph
4.8.2 Battery Power
3.2.4 UPS System Power Wiring Preparation
3.2.4 UPS System Power Wiring Preparation
Wiring.
Preparationfor wiring and termination requirements.
Wiring.
Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201764—Rev 14
UPS System Installation
Table
14), connect phase A, B, and C,
Table
14),connect phase A, B, and C,