Eaton Power Xpert 9395 Installation And Operation Manual page 74

Ups 1000-1100 kva, for use with three upm 650-825 kva and four upm 1000-1100 kva ups
Hide thumbs Also See for Power Xpert 9395:
Table of Contents

Advertisement

7.
Using a forklift with the forks in the front forklift slots, position the ISBM section adjacent to the left side of
the previously installed UPM section. Verify that the ISBM section right side is against the UPM section
left side and the front of the cabinet bases are flush with each other (see
8.
Reinstall the corner channel (see
9.
Reinstall the left middle panel (see
Figure 21. ISBM and UPM Sections Joined
10. Reinstall the left top panel (see
NOTE
Three flat cabinet joining brackets are provided in the hardware kit for securing the ISBM
and UPM sections at the top front, top rear, and front base (see Steps 11 and 12).
11. Locate the hardware kit (packed inside a drawstring bag tied to the left middle panel of the UPM section).
Locate two flat brackets and screws from the hardware kit. Align the holes in the flat brackets over holes in
the top rear and top front of the ISBM and UPM sections. Secure the brackets with the screws from the
hardware kit (see
Figure
12. Locate one flat bracket and screws from the hardware kit. Align the holes in the flat bracket over holes in
the front base of the ISBM and UPM sections. Secure the bracket with the screws from the hardware kit
(see
Figure
22).
13. Proceed to paragraph
4.4 Electrically Connecting the
Figure
20) and secure using the retained hardware.
Figure
20) and secure using the retained hardware.
UPM Wireway
(Power wiring harnesses are coiled in this area.)
Figure
20) and secure using the retained hardware.
22).
Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201764—Rev 14
Figure
Sections.
UPS System Installation
21).
53