Eaton Power Xpert 9395 Installation And Operation Manual page 69

Ups 1000-1100 kva, for use with three upm 650-825 kva and four upm 1000-1100 kva ups
Hide thumbs Also See for Power Xpert 9395:
Table of Contents

Advertisement

UPS System Installation
1.
If not already accomplished, use a forklift or pallet jack to move the ISBM and UPM sections to the
installation area, or as close as possible, before unloading from the pallets. If possible, move each section
using the pallet. Insert the forklift or pallet jack forks from the right side of the pallet (facing the cabinet),
between the supports on the bottom of the pallet (see
gravity measurements). If the sections must be moved using the cabinet front or rear fork lift slots, see the
caution statements at the beginning of this procedure.
2.
Remove the three bolts securing the left side shipping bracket to the cabinet and three bolts securing the
bracket to the pallet (see
cabinet permanently, retain the shipping bracket and securing hardware for later use.
3.
Remove the three bolts securing the right side shipping bracket to the cabinet and three bolts securing the
bracket to the pallet (see
Figure 16. Removing the ISBM Section Left Side Shipping Bracket
Shipping Bracket
Bolts
Shipping Bracket
Bolts
48
Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201764—Rev 14
Figure
16, or
Figure
18). Remove the left side shipping bracket. If installing the
Figure
17, or
Figure
19). Remove the right side shipping bracket.
Left Side Shipping
Bracket
Figure
11, for the ISBM and UPM section center of
Pallet
Front Door

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power xpert 9395p

Table of Contents