Installing Options and Accessories
Figure 57. Supervisory Contact Module II Terminal Location.
Ground
Terminal
Terminal TB2 Customer
Supervisory Contact Interface
Terminal TB1 Signal
Connections from the UPS
NOTE
9.
Install wiring between the SCM II terminal block TB2 and the monitoring equipment. See
terminal block location and
10. Close the front door and secure the latch.
11. Restart the UPS. See
104
Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201764—Rev 14
Terminal TB3
120 Vac Power
Setup of the Powerware Hot Sync CAN Bridge Card must be performed by an
authorized Eaton Customer Service Engineer. Contact an Eaton service representative
to schedule a date.
Figure 58
for terminal assignments.
Chapter 7 UPS Operating Instructions
for startup instructions.
Figure 57
for