Electric. National Electrical Code and NEC are registered trademarks of National Fire Protection Association, Inc. All other trademarks are property of their respective companies. ECopyright 2008-2013 Eaton Corporation, Raleigh, NC, USA. All rights reserved. No part of this document may be reproduced in any way without the express written approval of Eaton Corporation.
Engineer, or the warranty terms specified on page W-1 become void. This service is offered as part of the sales contract for the UPS. Contact an Eaton service representative in advance (usually a two-week notice is required) to reserve a preferred startup date.
Intelligent Power Management and Intelligent Power Protector software are available through Eaton support. See Chapter 8, “Communication,” for additional information. Options and Accessories Contact an Eaton sales representative for information about the following options. 1.2.1 Integrated Battery Cabinets Battery backup protection can be provided by equipping the UPS system with Power Xpert 9395 battery cabinets containing sealed lead‐acid, maintenance‐free batteries.
All UPSs in the distributed bypass system must contain the same number of UPMs. Mixed UPS kVA ratings are not permitted. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
Inherent Redundancy To deliver greater reliability, the Power Xpert 9395 UPS can be configured by an authorized Eaton Customer Service Engineer for inherent redundancy. When configured, the UPS automatically becomes redundant if the load is at or below the capacity of the UPMs minus the capacity of one UPM. Under normal conditions the UPMs in the UPS share the load equally.
An optional Powerware Environmental Monitoring Probe (EMP) is required for temperature/humidity monitoring. See Chapter 8, “Communication,” for additional information on monitoring and communication features. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
UPM battery configuration, DO NOT hook up the shunt trips. Using This Manual This manual describes how to install and operate the Power Xpert 9395 Plus 1 UPS (225–275 kVA) cabinet. Read and understand the procedures described in this manual to ensure trouble-free installation and operation.
This symbol indicates that you should not discard waste electrical or electronic equipment (WEEE) in the trash. For proper disposal, contact your local recycling/reuse or hazardous waste center. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
Detailed illustrations of the cabinet, including dimension and connection point drawings. Refer to the Eaton 9315, 9390 and 9395 Sync Control Installation and Operation Manual for the following additional information: Installation instructions, including site preparation, planning for installation, and wiring and safety information.
Page 22
INTRODUCTION This page intentionally left blank. 1-10 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Keep the UPS door closed and front panels installed to ensure proper cooling airflow and to protect personnel from dangerous voltages inside the unit. Do not install or operate the UPS system close to gas or electric heat sources. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
Page 24
Une mise au rebut réglementaire des batteries est obligatoire. Consulter les règlements en vigueur dans votre localité. Ne jamais jeter les batteries au feu. L'exposition aux flammes risque de les faire exploser. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
Page 25
Section I Installation www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Page 26
Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Engineer, or the warranty terms specified on page W-1 become void. This service is offered as part of the sales contract for the UPS. Contact an Eaton service representative in advance (usually a two-week notice is required) to reserve a preferred startup date.
Table 3‐1. UPS Cabinet Maximum Weights Maximum Weight kg (lb) Model Shipping Installed Power Xpert 9395-275/225 Plus1 1521 (3354) 1485 (3274) Power Xpert 9395-275/275 Plus 1 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Page 29
95%, non-condensing C A U T I O N If Eaton battery cabinets are located in the same room as the UPS, the battery cabinet environmental requirements supersede the UPS requirements. Operating temperatures above the recommended range will result in decreased battery life and performance, and will reduce or void the battery warranty. Refer to Eaton's Terms and Conditions of Sale with Battery Replacement Coverage and the Battery Replacement Price Book for more information.
Dimensions are in millimeters [inches]. Figure 3‐4. UPS Cabinet Dimensions (Bottom View) Front Dimensions are in millimeters [inches]. Figure 3‐5. UPS Cabinet Dimensions (Bottom View with Mounting Brackets) www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
CANNOT be used. DO NOT bond the inverter center point (E12) to ground: this is an internal UPS function and requires no additional work by the installer or user. Please contact the Eaton help desk listed in Chapter 1 for additional guidance regarding dual high impedance ground sources.
Page 34
AC Input to UPS Bypass (Four Wire) Amps Full Load Current (3) Phases, (1) Ground Minimum Conductor Size AWG or kcmil Number per Phase (each) www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Page 35
NOTE Callout letters , and map to Figure 6‐5 on page 6-8. Battery Conductor Sizing: Eaton strongly recommends using the specified DC conductor size and quantity shown above for optimum system performance and battery run time. Battery Cable Routing Requirements Conduit applications: * Each conduit must have a Positive, Negative, and Ground conductor.
Page 36
Figure 6‐6 on page 6-9. Callout letters , and map to Figure 6‐7 on page 6-10. Battery Conductor Sizing: Eaton strongly recommends using the specified DC conductor size and quantity shown above for optimum system performance and battery run time. Battery Cable Routing Requirements Conduit applications: * Each conduit must have a Positive, Negative, and Ground conductor.
Page 37
Basic Unit Rating Input and Output Voltage Volts 400/400 480/480 400/400 480/480 Neutral Bonding Jumper Minimum Conductor Size AWG or kcmil Number (each) 3-11 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Page 38
90°C. See Table 3‐8 for external power cable terminations, Table 3‐9 for supplied external wiring terminal hardware, and Table 3‐10 for recommended installation parts and tools not supplied by Eaton Corporation. For a UPS with separate rectifier input terminals for the UPMs, E1 through E3 are pressure terminations, UL and CSA rated at 90°C.
Page 39
Rectifier Input, Bypass Input, Conical Washer 180500037-120 Battery Input, and Output Rectifier Input, Bypass Input, 180200001-07 Battery Input, and Output Table 3‐10. Recommended Installation Parts and Tools (Not Supplied by Eaton Part Size Quantity Manufacturer Part Number Notes 2/0 AWG Thomas &...
Page 40
Table 3‐8 on page 3-12, type of battery installation, and requirements from NEC Table 4, Electrical Metallic Tubing (EMT). Battery Cable Routing: Refer to the notes at the bottom of Table 3‐4 Input/Output Ratings and External Wiring Requirements… 3-14 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
Page 41
AC output to critical load shown in Table 3‐4 on page 3-8 or Table 3‐5 on page 3-10. The recommended line‐to‐line load unbalance is 50% or less. 3-15 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Page 42
The battery wiring used between the battery and the UPS should not allow a voltage drop of more than 1% of nominal DC voltage at rated battery current. 3-16 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
Alarm relay contacts have a maximum current rating of 5A and a switched voltage rating of 30 Vac and 28 Vdc. Alarm relay wiring should be a minimum of 22 AWG. 3-17 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
DO NOT install both a source neutral and a bonding jumper. See Table 3‐7 for neutral bonding jumper wire sizes. The bonding jumper must be copper wire. Eaton UPS systems are designed to operate with two optional ground schemes. Both configurations comply with international safety regulations (as seen on the UPS name plate).
Page 45
CANNOT be used. DO NOT bond the inverter center point (E12) to ground: this is an internal UPS function and requires no additional work by the installer or user. Please contact the Eaton help desk listed in Chapter 1 for additional guidance regarding dual high impedance ground sources.
Carefully inspect the outer packaging for evidence of damage during transit. C A U T I O N Do not install a damaged cabinet. Report any damage to the carrier and contact an Eaton service representative immediately. NOTE For the following step, verify that the forklift or pallet jack is rated to handle the weight of the cabinet (see Table 3‐1 on page 3-2 for cabinet weight).
NOTE While waiting for installation, protect the unpacked cabinet from moisture, dust, and other harmful contaminants. Failure to store and protect the UPS properly may void your warranty. Figure 3‐8. Power Xpert 9395 Plus 1 UPS (225–275 kVA) Cabinet as Shipped on Pallet 3-21 www.eaton.com/powerquality...
Page 48
UPS INSTALLATION PLAN AND UNPACKING This page intentionally left blank. 3-22 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
End forklift slots may be used for minor positioning if the forks are kept in a horizontal position with no upward angling. If these instructions are not followed, damage to the wiring channel and wiring will occur. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
Page 50
Step 12. 12. If installing a tie cabinet or distribution panel for a distributed bypass system, proceed to paragraph 4.4; otherwise, proceed to paragraph 4.5. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
UPS SYSTEM INSTALLATION UPM Removable Front Panels Pallet Shipping Bracket Bolts Shipping Bracket Left Side Shipping Bolts Bracket Figure 4‐1. Removing the Left Side Shipping Bracket www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Center Front Panel Removable Left Front Panel Pallet Shipping Bracket Bolts Right Side Shipping Bracket Shipping Bracket Bolts Figure 4‐2. Removing the Right Side Shipping Bracket www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
UPS SYSTEM INSTALLATION Battery System Installation If installing an Eaton battery cabinet, refer to the Power Xpert 9395 Integrated Battery Cabinet (Model 1085 and 1085HR) Installation Manual, listed in paragraph 1.7 on page 1-9. If installing a customer-supplied battery system, install the battery system according to the battery and battery system manufacturer's instructions and all applicable codes and regulations, including the NEC, Article 480.
Remove the screws securing the internal safety shield panel and remove the panel to gain access to the input, output, and battery terminals. Retain the hardware for later use. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
Page 55
UPS cabinet. See paragraph 3.2.3 on page 3-7 for wiring and termination requirements. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
UPS unit to the customer-supplied tie cabinet or load distribution panel. See paragraph 3.2.3 on page 3-7 for wiring and termination requirements. 13. Proceed to paragraph 4.5.3. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
(A, B, C) (See Figure 4‐6 for Detail AA.) ISBM UPM 1 UPM 2 Figure 4‐5. UPS Power Terminal Locations – Common Rectifier Feed www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Alternate Ground Phase B (E7) UPS Bypass Terminal Bus Location Phase A (E6) Figure 4‐6. UPS Power Terminal Detail AA – Common Rectifier Feed 4-10 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
(+ - + - + - + -). * There must be a ground cable running in the raceway with the battery cables. If using an Eaton battery cabinet, proceed to Step 2; otherwise, proceed to Step 4. Route and connect the battery cables between the UPS and battery cabinet or...
UPS SYSTEM INSTALLATION DC Input from Battery + (E4) DC Input from Battery – (E5) Figure 4‐10. UPS Power Terminal Detail BB – Common Battery 4-14 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Chapter 7, “UPS Operating Instructions,” for shutdown instructions. Unfasten the front door latch and swing the door open (see Figure 4‐2 on page 4-4). 4-15 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Page 64
16. If removed, reinstall the safety shield panel removed in Step 6. Secure with the retained hardware. 17. If removed, reinstall the left front panel removed in Step 5 and secure with the retained hardware. 4-16 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
(See Figure 4‐13 for Detail.) (See Figure 4‐18 on page 4-24 for detail.) (See Figure 4‐15 on page 4-20 for terminal assignments.) Figure 4‐12. Interface Terminal Locations 4-17 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Page 66
Building Alarm 5 Return NOTE “Return“ indicates connection to electronics circuit ground. “Common” indicates connection to common side of isolated relay contact. 4-18 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
NOTE Do not directly connect relay contacts to the mains related circuits. Reinforced insulation to the mains is required. NOTE Alarm relay wiring should be a minimum of 22 AWG Figure 4‐14. Typical Alarm Relay Connection 4-19 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
NOTE A jumper wire must be connected between pins 1 and 2 on TB1, if the normally-closed REPO contact is not used. Figure 4‐15. Terminal Blocks TB1, TB2, and TB3 Connector Assignments 4-20 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
(see Figure 4‐4 on page 4-8). 10. Reinstall the interface entry plates and install the conduit. 11. If using an Eaton battery cabinet, proceed to Step 12; otherwise, proceed to Step 15. NOTE The 9395 system can trip a maximum of six battery cabinets total. This applies to both the 1085 standard and High Rate series batteries.
48 Vdc Battery Shunt Trip – NOTE Battery Aux and DC shunt trip wiring should be a minimum of 18 AWG. Figure 4‐16. Typical Battery Interface Connection 4-22 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
NOTE When installing external wiring to X-Slot cards, conduit must be installed to the UPS cabinet. When installing internal wiring to X-Slot terminals, route the wiring through the internal opening in the X-Slot communication bay. For installation and setup of an X-Slot card, contact an Eaton service representative (see page 1-9). To install wiring to connections: If not already installed, install the LAN drops.
NOTE The REPO switch must be a normally-open or normally-closed latching‐type switch not tied into any other circuits. NOTE This procedure is intended to be used for the installation of the Eaton-supplied REPO switch. If installing another manufacturer's switch, use this procedure only as a guide.
1 and 2 on TB1. 14. If you are installing multiple REPO switches, wire additional switches in parallel with the first REPO. 4-25 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Figure 4‐21 shows the wiring connections if the normally-closed REPO contacts are used, and Figure 4‐22 shows alternative methods of connecting a REPO switch if using another manufacturer's switch. 4-26 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
NOTE REPO normally-open and normally-closed return terminals are separated on the terminal board but are electrically in common. Figure 4‐22. Normally‐Closed and Normally‐Open REPO Switch Wiring 4-27 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
Service Engineer, or the warranty terms specified on page W-1 become void. This service is offered as part of the sales contract for the UPS. Contact an Eaton service representative in advance (usually a two-week notice is required) to reserve a preferred startup date.
Page 77
- Accessories are mounted in installed locations and wiring is terminated inside the UPS cabinet. (OPTIONAL) - The debris shields covering the UPS cabinet ventilation grills are removed. - Startup and operational checks are performed by an authorized Eaton Customer Service Engineer. 4-29 www.eaton.com/powerquality...
Page 78
- Pull-chain wiring between the UPS cabinets is properly installed. - Adequate workspace exists around the UPS cabinets, the tie cabinet, and other cabinets. - Startup and operational checks are performed by an authorized Eaton Customer Service Engineer. 4-30 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
Page 79
UPS SYSTEM INSTALLATION Notes _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ 4-31 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Page 80
UPS SYSTEM INSTALLATION This page intentionally left blank. 4-32 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Powerware Hot Sync CAN Bridge card (see paragraph 5.1) Parallel system wiring (see paragraph 5.2) RMP II (see paragraph 5.3) RIM II (see paragraph 5.4) SCM II (see paragraph 5.5) www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Figure 4‐18 on page 4-24 for X-Slot communication bay locations. To locate the appropriate terminals on the Powerware Hot Sync CAN Bridge Card, see Figure 5‐2 and Table 5‐1. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
Normally‐open contact closes when UPS is on bypass. RMP II, RIM II, and SCM II connections. CAN L Can H CAN Input for parallel operation. Shield www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
NOTE Setup of the Powerware Hot Sync CAN Bridge Card for parallel operation must be performed by an authorized Eaton Customer Service Engineer. Contact an Eaton service representative to schedule a date. 12. Reinstall the small top internal safety shield panel and secure with the cabinet mounted screws.
NOTE Use twisted-pair wiring between the UPS and MOB AUX contacts. NOTE Always confirm contact operation prior to wiring. Figure 5‐6. Distributed Bypass Pull-Chain Wiring with MOBs www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
Page 88
MOB 2 Aux 2 Com MOB 3 Aux 2 Com Pull Chain MOB Common MOB 3 Aux 2 Com MOB 4 Aux 2 Com www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
11. If removed, reinstall the left front panel removed in paragraph 5.1, Step 4 and secure with the retained hardware. 12. Restart the UPS. See Chapter 7, “UPS Operating Instructions,” for startup instructions. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
INSTALLING OPTIONS AND ACCESSORIES NOTE Setup of the Powerware Hot Sync CAN Bridge Card must be performed by an authorized Eaton Customer Service Engineer. Contact an Eaton service representative to schedule a date. 13. To check the operation of the RMP II, ensure that the UPS is supplying the load via inverter or bypass.
12. Restart the UPS. See Chapter 7, “UPS Operating Instructions,” for startup instructions. NOTE Setup of the Powerware Hot Sync CAN Bridge Card must be performed by an authorized Eaton Customer Service Engineer. Contact an Eaton service representative to schedule a date.
INSTALLING OPTIONS AND ACCESSORIES NOTE Setup of the Powerware Hot Sync CAN Bridge Card must be performed by an authorized Eaton Customer Service Engineer. Contact an Eaton service representative to schedule a date. Install wiring between the SCM II terminal block TB2 and the monitoring equipment.
Surface Mount using #10 Pan Head Screws for Hanging. (Mount with vent holes facing up.) Dimensions are in millimeters [inches]. Figure 5‐12. Remote Monitor Panel II Dimensions 5-15 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Surface Mount using #10 Pan Head Screws for Hanging. (Mount with vent holes facing up.) Dimensions are in millimeters [inches]. Figure 5‐13. Relay Interface Module II Dimensions 5-16 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Surface Mount using #10 Pan Head Screws for Hanging. (Mount with vent holes facing up.) Dimensions are in millimeters [inches]. Figure 5‐14. Supervisory Contact Module II Dimensions 5-17 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Page 98
INSTALLING OPTIONS AND ACCESSORIES This page intentionally left blank. 5-18 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Page 99
Section II Operation 5-19 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Page 100
5-20 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
K5. The backfeed protection contactor is located in series with the static switch. For manual transfers to bypass, the static switch is also used. The static switch is armed and ready during both types of transfers. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
DC voltage charge current to the battery. The battery is always connected to the UPS and ready to support the inverter should the utility input become unavailable. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
UPS actively monitors the critical bus for power disturbances. When in this mode, the input and output contactors are closed and the link is maintained through the diode bridge. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
UPM to immediately return to active mode in the event of a disturbance or load step on the critical bus. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
Main Power Flow Breakers Contactors Trickle Current Closed Battery Breaker Energized Open De-Energized Battery Figure 6‐3. Path of Current Through the UPS in Bypass Mode www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Main Power Flow Breakers Contactors Trickle Current Closed Battery Breaker Energized Open De-Energized Battery Figure 6‐4. Path of Current Through the UPS in Battery Mode www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
NOTE If the load requires a neutral, a bypass source neutral must be provided. DO NOT install both a source neutral and a bonding jumper. Figure 6‐5. UPS System – Common Rectifier Feed, Common Battery, Dual‐Feed Configuration www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
NOTE If the load requires a neutral, a bypass source neutral must be provided. DO NOT install both a source neutral and a bonding jumper. Figure 6‐6. UPS System – Common Rectifier Feed, Separate Battery, Dual‐Feed Configuration www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
NOTE If the load requires a neutral, a bypass source neutral must be provided. DO NOT install both a source neutral and a bonding jumper. Figure 6‐7. UPS System – Separate Rectifier Feed, Separate Battery, Dual‐Feed Configuration 6-10 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
(BIB) is installed in the maintenance bypass and a single-feed UPS is being installed, a single feed to the maintenance bypass is acceptable for supplying both the UPS and the bypass. Figure 6‐8. Simplified Dual-Feed UPS with Maintenance Bypass Panel 6-11 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
UPS will require at least one UPM to be in double-conversion mode at all times; otherwise, VMMS mode operates the same as it does in a single UPS system (see paragraph 6.2.5). 6-12 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Bypass mode. The distributed bypass system automatically returns to Online mode when the overload condition is cleared and system operation is restored within specified limits. 6-13 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
If more modules than can support the load must be taken offline, the load must be transferred to maintenance bypass or shut down. 6-14 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
In the Parallel Capacity (N+0) arrangement, if one UPS trips offline and goes to bypass, the remaining UPSs also go to bypass. 6-15 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Closed Output to Main Power Flow Critical Load Open Figure 6‐11. Path of Current through the UPSs in Battery Mode – Distributed Bypass 6-16 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
NOTE If the load requires a neutral, a bypass source neutral must be provided. DO NOT install both a source neutral and a bonding jumper. Figure 6‐12. Typical Distributed Bypass System (1+1 and 2+0 Configurations) 6-18 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
NOTE If the load requires a neutral, a bypass source neutral must be provided. DO NOT install both a source neutral and a bonding jumper. Figure 6‐13. Typical Distributed Bypass System (2+1 and 3+0 Configurations) 6-19 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
NOTE If the load requires a neutral, a bypass source neutral must be provided. DO NOT install both a source neutral and a bonding jumper. Figure 6‐14. Typical Distributed Bypass System (3+1 and 4+0 Configurations) 6-20 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
The following paragraphs describe using the UPS control panel to monitor the UPS. See paragraph 7.3 for use of the operational controls. When the unit powers up, the screen displays the Eaton logo as shown in Figure 7‐2. To advance to the Main Menu and Mimic screen, press any control panel pushbutton once.
LCD in the UPS status area. This message is also written to the Active Events Log and may be added to the History Log. The messages are divided into four categories: alarms, notices, status, and commands. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
LOAD OFF Figure 7‐3. Parts of the LCD The UPS status area automatically scrolls between the Eaton model number, current date and time, active alarms, active notices, and load percent and battery runtime for the UPS. If the Environmental Monitoring Probe is installed, the temperature and humidity sensed by the probe will also be displayed.
The Battery screen displays the battery voltage (Vdc), the battery current (Idc), the minutes of Battery – UPM battery time remaining, and battery temperature. Battery temperature must be set up by an authorized Eaton Customer Service Engineer. When battery life decreases to less than 20%, Check Battery is displayed. Statistics The Statistics screen displays the hours on line and the total kW hours used.
Page 127
VMMS UPM Redundancy screen. Use the up or down arrow pushbutton to set the number of UPMs. Press SAVE or ABORT. Once the action is completed, the Module Management System Setup screen is displayed. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
Page 128
Press SAVE or ABORT. Once the action is completed, the COM Port Setup screen is displayed. Controls See paragraph 7.2.8 for details. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Table 7‐5 describes the control functions and provides instructions to access and use the command menu screens. For detailed information about using the System Controls, see paragraph 7.3. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
Starts the UPS in Bypass mode or transfers the UPS to Bypass mode from Online mode. Load Off Displays the Load Off screen (see paragraph 7.2.7). 7-10 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Page 131
Charger Off Turns the battery charger off. NOTE The Energy Saver System and Variable Module Management System mode commands are displayed only if enabled at the factory or by an Eaton Customer Service Engineer NOTE Variable Module Management System and Energy Saver System modes are mutually exclusive.
7.3.24 or paragraph 7.4.27. HOLD LOAD OFF BUTTON FOR 3 SECONDS TO TURN OFF LOAD CANCEL LOAD OFF Figure 7‐7. Load Off Screen 7-12 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
UPS is in Bypass mode. If Auto Bypass is not enabled, the UPS output remains off until the UPS transfers to Online mode. 7-13 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
To enable Energy Saver System mode: NOTE The Energy Saver System mode commands are displayed only if enabled at the factory or by an Eaton Customer Service Engineer. NOTE The Variable Module Management System and Energy Saver System modes are mutually exclusive.
Menu To start High Alert mode: NOTE The High Alert mode commands are displayed only if enabled at the factory or by an Eaton Customer Service Engineer. NOTE The Variable Module Management System and Energy Saver System modes are mutually exclusive.
To enable Variable Module Management System mode: NOTE The Variable Module Management System mode commands are displayed only if enabled at the factory or by an Eaton Customer Service Engineer. NOTE The Variable Module Management System and Energy Saver System modes are mutually exclusive.
UPS Command Menu To start High Alert mode: NOTE The High Alert mode commands are displayed only if enabled at the factory or by an Eaton Customer Service Engineer. NOTE The Variable Module Management System and Energy Saver System modes are mutually exclusive.
To enable Energy Saver System mode: NOTE The Energy Saver System mode commands are displayed only if enabled at the factory or by an Eaton Customer Service Engineer. NOTE The Variable Module Management System and Energy Saver System modes are mutually exclusive.
Command Menu To start High Alert mode: NOTE The High Alert mode commands are displayed only if enabled at the factory or by an Eaton Customer Service Engineer. NOTE The Variable Module Management System and Energy Saver System modes are mutually exclusive.
Bypass Command Menu To start High Alert mode: NOTE The High Alert mode commands are displayed only if enabled at the factory or by an Eaton Customer Service Engineer. NOTE The Variable Module Management System and Energy Saver System modes are mutually exclusive.
18. On the UPM 1 Control Command screen, select UPM ON 19. Press the pushbutton on the UPM 1 Command menu bar. SELECT 7-21 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
11. If UPM 4 (FI-UPM) is installed, proceed to Step 12; otherwise, proceed to Step 16. 12. On the System Status screen, select the command. The UPS Control Command screen screen is displayed. 7-22 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
The Bypass status indicates ON. The BYPASS UPM status indicates READY. The power module remains on. 7-23 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
UPM 1 Command menu bar. SELECT The UPM status indicates READY The input, output, and battery contactors open, and the power module remains on. 7-24 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
The UPM status indicates SHUTDOWN The power module is turned off. The remaining UPMs continue to supply the critical load. Logic power remains on. 7-25 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
UPM GO TO ONLINE 14. Press the pushbutton on the UPM Command menu bar. SELECT The UPM transfers to Online mode. The UPM status indicates ONLINE. 7-26 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Control Command screen is displayed. On the Charger Control Command screen, select CHARGER OFF Press the pushbutton on the Charger Command menu bar. SELECT 7-27 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Press the pushbutton on the Command menu bar. SELECT The Load Off screen is displayed, providing a choice to proceed or abort the shutdown. 7-28 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Page 149
W A R N I N G Power is present inside the UPS cabinet until the upstream input feeder circuit breaker is opened. 7-29 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
NOTE The following instructions are for the Eaton-supplied REPO switch. If a customer-supplied REPO switch is used, it may not activate in the same manner; refer to the operating instructions provided with the switch.
UPS is in Bypass mode. If Auto Bypass is not enabled, the UPS outputs remain off until the UPSs transfer to Online mode. 7-31 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
To enable Energy Saver System mode: NOTE The Energy Saver System mode commands are displayed only if enabled at the factory or by an Eaton Customer Service Engineer. NOTE The Variable Module Management System and Energy Saver System modes are mutually exclusive.
Menu To start High Alert mode: NOTE The High Alert mode commands are displayed only if enabled at the factory or by an Eaton Customer Service Engineer. NOTE The Variable Module Management System and Energy Saver System modes are mutually exclusive.
To enable Variable Module Management System mode: NOTE The Variable Module Management System mode commands are displayed only if enabled at the factory or by an Eaton Customer Service Engineer. NOTE The Variable Module Management System and Energy Saver System modes are mutually exclusive.
UPS Command Menu To start High Alert mode: NOTE The High Alert mode commands are displayed only if enabled at the factory or by an Eaton Customer Service Engineer. NOTE The Variable Module Management System and Energy Saver System modes are mutually exclusive.
To enable Energy Saver System mode: NOTE The Energy Saver System mode commands are displayed only if enabled at the factory or by an Eaton Customer Service Engineer. NOTE The Variable Module Management System and Energy Saver System modes are mutually exclusive.
Command Menu To start High Alert mode: NOTE The High Alert mode commands are displayed only if enabled at the factory or by an Eaton Customer Service Engineer. NOTE The Variable Module Management System and Energy Saver System modes are mutually exclusive.
To enable Variable Module Management System mode: NOTE The Variable Module Management System mode commands are displayed only if enabled at the factory or by an Eaton Customer Service Engineer. NOTE The Variable Module Management System and Energy Saver System modes are mutually exclusive.
Bypass Command Menu To start High Alert mode: NOTE The High Alert mode commands are displayed only if enabled at the factory or by an Eaton Customer Service Engineer. NOTE The Variable Module Management System and Energy Saver System modes are mutually exclusive.
Page 160
23. Repeat Steps 1 through 22 for each UPS in the distributed bypass system. NOTE To transfer to Online mode after starting individual UPMs, follow the procedure in paragraph 7.4.18. 7-40 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
21. To transfer the UPM to Online mode, press the pushbutton on the CONTROLS UPS Control Command menu bar. The UPM Control Command screen is displayed. 7-41 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
The Online status indicator is illuminated. The UPS status indicates ONLINE. The UPM status indicates ONLINE. 7-42 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
The System Status CONTROLS screen is displayed. If UPM 4 (FI-UPM) is installed, proceed to Step 3; otherwise, proceed to Step 7. 7-43 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
UPM Control Command screen is displayed. On the UPM Control Command screen, select UPM ON 10. Press the pushbutton on the UPM Command menu bar. SELECT 7-44 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Logic power remains on. Verify the battery breaker or disconnect for the UPS being shut down is open. If not, open the breaker. 7-45 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
System Status Command menu bar. The CONTROLS UPM 1 Control Command screen is displayed. 14. On the UPM 1 Control Command screen, select UPM OFF 7-46 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
11. Verify the External Communications Failure alarm has cleared and no other alarms are active on the online UPSs. 12. On the System Status screen, select the command. 7-47 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
On the System Status screen, select the command. CHARGER Press the pushbutton on the System Status menu bar. The Charger CONTROLS Control Command screen is displayed. 7-48 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Do not attempt to restart the system after Load Off until the cause of the shutdown has been identified and cleared. Restart the UPS after pressing the pushbutton by following the LOAD OFF procedure in paragraph 7.4.1 or 7.4.8. 7-49 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Page 170
W A R N I N G Power is present inside the UPS cabinet until the upstream input feeder circuit breaker is opened. 7-50 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
NOTE The following instructions are for the Eaton-supplied REPO switch. If a customer-supplied REPO switch is used, it may not activate in the same manner; refer to the operating instructions provided with the switch.
UPS. For a description of the control panel functions, see paragraph 7.6. Color Touchscreen Control Panel ISBM Figure 7‐9. Color Touchscreen Control Panel Location (Typical) 7-52 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
When the unit powers up, the screen displays as shown in Figure 7‐10. When power is applied to the system, the display advances to the Sign In screen shown in Figure 7‐11 . 7-53 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
(see Figure 7‐12). Figure 7‐11. Parts of the Touch Screen 7-54 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
UPS OPERATING INSTRUCTIONS The UPS status area automatically displays the Eaton model number, current time and date, active alarms, active notices, and load percent and battery run time for the UPS. If the Environmental Monitoring Probe is installed, the temperature and humidity sensed by the probe will also be displayed. The small head symbol between the system model and time allows the operator select a different language from an imbedded list.
NOTE Screens shown are representative examples of system operation. The screen data will vary based on system activity at the time of observation. 7-56 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Figure 7‐14. Main Menu and Power Maps Screen (Online Mode) Touching the LOAD kVA button displays the Output kVA screen shown in Figure 7‐15 Figure 7‐15. Output kVA Screen from Home Screen 7-57 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Figure 7‐16. Average Efficiency Screen from Home Screen Touching the CONSUMPTION button displays the screen shown in Figure 7‐17. Figure 7‐17. Consumption Screen from Home Screen 7-58 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Figure 7‐19 is an example of a command request confirmation pop-up screen. This type of pop-up allows the user to confirm that the requested command is valid. Figure 7‐19. Typical Command Confirmation Screen (Charger Off) 7-59 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
24 hours, 7 days, 30 days, or 1 year. This is true of all the meters screens listed in the top section. Figure 7‐16 Figure 7‐17 Figure 7‐20. Meters Summary Screen 7-60 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
UPS OPERATING INSTRUCTIONS The Output Meters Screen shown in Figure 7‐23 displays values pertaining to the system output. Figure 7‐23. Output Meters Screen 7-62 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
The Select Source screen shown in Figure 7‐25 allows the operator to choose the individual source for system readings. Figure 7‐25. Select Source Screen 7-63 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
LCD in the UPS status area. This message is also written to the Active Events Log and may be added to the History Log. The messages are divided into four categories: alarms, notices, status, and commands. 7-66 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Selecting an event opens the Event Detail screen shown in Figure 7‐32. This screen details the specifics of the event for the user to see. Figure 7‐32. User Log Detail Screen 7-67 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Figure 7‐34 shows the Module Controls screen. This screen allows control of the individual modules within the system. It also gives their values and status. Figure 7‐34. Module Controls Screen 7-68 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
The Metering Method screen allows the operator to select line-to-line or line-to-neutral monitoring values. See Figure 7‐36 or Figure 7‐37. Figure 7‐36. Online Mode Metering Method Option Screen 7-69 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
CLEAN SCREEN button disables the screen for 30 seconds to allow the user to safely clean the screen without affecting operation. Figure 7‐38. Settings Screen 7-70 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
The various Energy Advantage Architecture operations are described in the UPS Installation and Operation manual for your system. Figure 7‐40. Energy Advantage Architecture (EAA) Screen 7-71 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
This screen shown in Figure 7‐41 asks the operator to verify disabling the ESS mode running at that time. Figure 7‐42. HRS Metering Screen The screen shown in Figure 7‐42 shows the HRS metering values. 7-72 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
The screen shown in Figure 7‐44 allows the operator to query the system for various operational statistics such as shown in Figure 7‐45. Figure 7‐44. Statistics Basic Screen 7-73 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Figure 7‐47. UPS Module Map Screen 7.6.20 System Overview Screen The screen shown Figure 7‐48 displays values for all UPS and UPM parameters. Figure 7‐48. System Overview Screen 7-75 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
UPS Operation using the Color Touchscreen Control Panel NOTE The Energy Saver System mode commands are displayed only if installed at the factory or by an Eaton Customer Service Engineer. NOTE The Variable Module Management System and Energy Saver System modes are mutually exclusive.
Page 197
The operator cannot inadvertently cause a system dump or disconnect unless they override a warning pop-up. Value or information screens DO NOT affect system operation. 7-77 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Page 198
UPS OPERATING INSTRUCTIONS This page intentionally left blank. 7-78 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
LAN drops for use with X-Slot connectivity cards must be provided by facility planners or the customer. For installation and setup of an X-Slot card, contact an Eaton service representative (see page 1-9). Refer to the manual supplied with the X-Slot card for user instructions.
The Power Xpert 9395 UPS supports Eaton's eNotify Service. eNotify Service is included at no charge during the first year of operation (warranty period), and also with the purchase of a specific Eaton Support Agreement after the initial warranty expires. eNotify and support agreement availability or specific features may vary by market;...
The software’s mass configuration capabilities make installation and maintenance easy, which minimizes the effort required and benefits the bottom line. Eaton’s costeffective Intelligent Power Software manages up to ten devices at no charge, with licences for up to 100 devices – or even an unlimited number – also available.
RMP II contains backlit status indicators and a local horn. The RMP II can be flush‐mounted or surface‐mounted on a desktop, or secured to a wall. Figure 8‐2 shows an RMP II. Figure 8‐2. Remote Monitor Panel II www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Page 203
The UPS is preparing to shut down because the UPS is in Battery mode and the DC voltage is approaching its low limit. This indicator is accompanied by a horn. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
Contacts are closed when approximately two minutes of battery time is remaining before the critical load is lost. UTILITY FAILURE Pins 6 and 15 Contacts are closed when Utility Failure is detected. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
BYPASS NOT AVAILABLE TB2‐10 through TB2‐12 ON BATTERY TB2‐13 through TB2‐15 UPS ALARM TB2‐16 through TB2‐18 ON BYPASS TB2‐19 through TB2‐21 SHUTDOWN IMMINENT TB2‐22 through TB2‐24 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Page 206
COMMUNICATION This page intentionally left blank. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Eaton service representative. If the string requires service, refer to the battery manufacturer's operating manual for instructions on battery maintenance or contact an Eaton service representative. Observe these precautions when working on or around batteries: Remove watches, rings, or other metal objects.
Check the UPS air filters (located behind the front panels) and wash or replace as necessary. See Figure 9‐1 for filter locations. The ISBM filter size is 12” 20” 0.25” and the UPM filter sizes are 20” 44” 0.25”. Contact an Eaton service representative for replacement filters. To remove the filters: Remove one top screw and two bottom screws securing each UPM front panel (see Figure 4‐1).
ANNUAL Maintenance Annual preventive maintenance should be performed only by authorized service personnel familiar with maintenance and servicing of the UPS system. Contact an Eaton service representative for more information about service offerings. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual...
Maintenance Training A basic training course, available from Eaton Corporation, gives you a competent working knowledge of the UPS system operation and teaches you how to perform first level corrective maintenance. For more information about training and other services, contact the Help Desk (see page 1-9).
Configurable per UPM at nominal line voltage: Up to 120A with less than 85% load Up to 80A with 100% load Battery Shunt Trip 48 Vdc 10-1 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Meets IEC 801‐2 specifications. Withstands up to 25 kV pulse Immunity without damage and with no disturbance or adverse effect to the critical load. 10-2 www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...
Eaton-built battery cabinets (individually and collectively, the ”Warranted Items”) are free from defects in material and workmanship. If, in the opinion of Eaton, a Warranted Item is defective and the defect is within the terms of this Warranty, Eaton's sole obligation will be to repair or replace such defective item (including by providing service, parts, and labor, as applicable), at the option of Eaton.
Page 214
WARRANTY This page intentionally left blank. www.eaton.com/powerquality Power Xpert 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual 164201710 Rev 7...