Eaton Power Xpert 9395 Installation And Operation Manual page 75

Ups 1000-1100 kva, for use with three upm 650-825 kva and four upm 1000-1100 kva ups
Hide thumbs Also See for Power Xpert 9395:
Table of Contents

Advertisement

UPS System Installation
Figure 22. ISBM Section to UPM Section Joining Brackets
Screw from Kit
Bracket from Kit
ISBM
Section Top
Top View Front Bracket
4 4 . . 4 4
E E l l e e c c t t r r i i c c a a l l l l y y C C o o n n n n e e c c t t i i n n g g t t h h e e S S e e c c t t i i o o n n s s
1.
Unfasten the front door latch and swing the door open (see
2.
Remove the door. Remove the retaining screw located inside the door at the bottom hinge pivot point,
then lift the door off. Retain the hardware for later use.
3.
Remove the screws securing the ISBM section right bottom internal safety shield panel and remove the
panel to gain access to the internal input, output, and battery terminals. Retain the hardware for later use.
NOTE
4.
Locate the AC and DC input intercabinet power wiring harnesses (long cables labeled xG1, xG2, and xG3).
Remove wire ties as necessary and uncoil the cables.
5.
Locate the 1G1, 1G2, 2G1, 2G2, 3G1, and 3G2 power wiring harnesses. Route these harnesses through
the wiring access in the right side panel of the ISBM section to the AC Input to UPMs terminals. See
Figure 23
54
Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201764—Rev 14
Screw from Kit
UPM
Section Top
Front
Bracket from Kit
ISBM Section Base
Screw from Kit
AC and DC input intercabinet power wiring harnesses are supplied coiled and secured in
the UPM wireway on the left side of the UPM section (see
for common rectifier feed with Continuous Static Switch (CSS) terminal locations.
Screw from Kit
Bracket from Kit
ISBM
Section Top
Front View Base Bracket
Screw from Kit
Figure
Screw from Kit
Back
Section Top
Top View Rear Bracket
UPM Section Base
16).
Figure
21)
UPM

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power xpert 9395p

Table of Contents