Figure 5-7. Remote Monitor Panel Ii And Remote Monitor Panel Ii Terminal Locations - Eaton Power Xpert Plus 1 Installation And Operation Manual

450–550 kva
Table of Contents

Advertisement

NOTE When installing signal wiring for CAN card J3 terminals, conduit must be installed between the
device and the UPS cabinet.
4.
5.
6.
7.
NOTE 120 Vac for the RMP II should be supplied from the critical bus by facility planners or the customer.
8.
9.
10. If removed, reinstall the safety shield panel removed in paragraph 5.1, Step 5.
11. If removed, reinstall the left front panel removed in paragraph 5.1, Step 4 and
12. Restart the UPS. See Chapter 7, "UPS Operating Instructions," for startup
Terminal TB1
Signal Connections
from the UPS
t
Power Xpert
9395 UPS (450–550 kVA) Installation and Operation Manual
Remove the UPS cabinet top interface conduit landing plates to drill or punch
conduit holes (see Figure 4‐4 on page 4-8).
Reinstall the conduit landing plate.
Install conduit between the UPS and RMP II. See Figure 5‐12 on page 5-15 for
RMP II knockout hole location.
Install wiring between the UPS and RMP II. See Figure 5‐2 and Table 5‐1 for the
Powerware Hot Sync CAN Bridge Card terminal location and wiring information,
and Figure 5‐7, Figure 5‐8, and Table 5‐5 for the RMP II terminal location and
wiring information.
Install 120 Vac power wiring from the critical bus to the RMP II. See Figure 5‐7,
Figure 5‐8, and Table 5‐5 for the terminal location and wiring information.
Close the front door and secure the latch.
Secure with the retained hardware.
secure with the retained hardware.
instructions.
Figure 5‐7. Remote Monitor Panel II and Remote Monitor Panel II Terminal Locations
INSTALLING OPTIONS AND ACCESSORIES
Ground
Terminal
S
www.eaton.com/powerquality
164201701 Rev 4
Terminal TB3
120 Vac Power
5-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power xpert 9395

Table of Contents