Figure 45. Remote Monitor Panel Ii And Remote Monitor Panel Ii Terminal Locations - Eaton Power Xpert 9395C Installation And Operation Manual

Table of Contents

Advertisement

Installing Options and Accessories
3.
Securely mount the SCM II at the desired location. See
NOTE
4.
Remove the ISBM cabinet top right interface conduit landing plate to drill or punch conduit holes (see
Figure
5.
Reinstall the conduit landing plate.
6.
Install conduit between the UPS and SCM II. See
7.
Install wiring between the UPS and SCM II. See
Bridge Card terminal location and wiring information, and
terminal location and wiring information.
NOTE
8.
Install 120 Vac power wiring from the critical bus to the SCM II. See
the terminal location and wiring information
NOTE
9.
Close the front door and secure the latch.
10. Restart the UPS. See

Figure 45. Remote Monitor Panel II and Remote Monitor Panel II Terminal Locations

Terminal TB1
Signal Connections
from the UPS
78
Eaton Power Xpert 9395C UPS Installation and Operation Manual 164000821—Rev 06
When installing signal wiring for CAN card J3 terminals, conduit must be installed
between the device and the UPS cabinet.
27).
120 Vac for the RMP II should be supplied from the critical bus by facility planners or the
customer.
Setup of the Powerware Hot Sync CAN Bridge Card must be performed by an
authorized Eaton Customer Service Engineer. Contact an Eaton service representative
to schedule a date.
Chapter 7 UPS Operating Instructions
Figure 52
for mounting hole locations.
Figure 52
for SCM II knockout hole location.
Figure 42
and
Table 17
for the Powerware Hot Sync CAN
Figure
48,
Figure
46, and
Figure
48,
for startup instructions.
Ground
Terminal
Terminal TB3
120 Vac Power
Table 21
for the SCM II
Figure
46, and
Table 21
for

Advertisement

Table of Contents
loading

Table of Contents