7. Place the server on a flat, level surface with the access panel facing up.
Slide the server into the rack
Slide the server into the rack
Procedure
Procedure
1. Press and hold the blue release latches on both rails, and then slide the server tray back into the rack.
2. Tighten the server tray thumbscrews.
HPE ProLiant ML30 Gen10 Server Maintenance and Service Guide
32