Removing And Replacing A Usb Rdx Drive - HPE ProLiant ML30 Gen10 Maintenance And Service Manual

Hide thumbs Also See for ProLiant ML30 Gen10:
Table of Contents

Advertisement

If the server is in tower mode: Position the tower server for hardware configuration.
If the server is in rack mode: Remove the server from the rack .
5. Remove the front bezel .
6. Remove the access panel .
7. If installed, remove the air baffle .
8. Disconnect the SAS-power Y-cable from the LTO tape drive .
9. Pull up and hold the release latch, and then remove the LTO tape drive.
To replace the component, reverse the removal procedure.
Before installing the replacement LTO tape drive in the media bay, install the mounting screws included in the spare kit on the tape
drive.

Removing and replacing a USB RDX drive

Removing and replacing a USB RDX drive
Prerequisites
Prerequisites
Before you perform this procedure, make sure that you have a T-15 Torx screwdriver available.
Procedure
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. Do one of the following:
If the server is in tower mode: Position the tower server for hardware configuration.
If the server is in rack mode: Remove the server from the rack .
HPE ProLiant ML30 Gen10 Server Maintenance and Service Guide
45

Advertisement

Table of Contents
loading

Table of Contents