HPE ProLiant ML30 Gen10 Maintenance And Service Manual page 65

Hide thumbs Also See for ProLiant ML30 Gen10:
Table of Contents

Advertisement

Removing and replacing the energy pack
Removing and replacing the energy pack
Procedure
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. Do one of the following:
If the server is in tower mode: Position the tower server for hardware configuration.
If the server is in rack mode: Remove the server from the rack .
5. Remove the front bezel .
6. Remove the access panel .
7. If installed, remove the air baffle .
8. Remove the energy pack:
a. Disconnect the energy pack cable.
b. Press the release latch on one of the holders.
c. Lift one end of the energy pack.
d. Remove the entire energy pack from the holders.
To replace the component, reverse the removal procedure.
Removing and replacing the energy pack holders
Removing and replacing the energy pack holders
HPE ProLiant ML30 Gen10 Server Maintenance and Service Guide
65

Advertisement

Table of Contents
loading

Table of Contents