2.1. Outline of installation procedure

Install the flowmeter according to the following procedure.
Section 3.3
Installation of flow transmitter
Section 3.4
Flow transmitter wiring
Power ON
Section 4.4
Parameter protection
Checking and Setting of Piping
Section 4.6
Specifications/Detector
OK
Section 5
MOUNTING OF DETECTOR
Section
Checking the RAS information
6.3.1.3
OK
Basic operation
Section 4.7
Setting of unit
Section
Volume flow range (single range)
4.8.1.1
Section
4.8.1.4
Analog output at error (Burnout)
Application operation
Section
Setting of flow rate range
4.8.1
Section
Automatic 2 ranges
4.9.1
Section
Bi-directional range
4.9.2
Section
4.9.3
Bi-directional auto 2 range
Section 7.3
Parameter list
Run (Measurement)
Chapter 6
CHECK AND MAINTENANCE
Note) When making changes to settings, do so after turning OFF parameter protection.

2. OPERATION PREPARATION

When A or B is selected for the 7th digit
(LED display is green)
*
Check the power supply specifications and wiring before
turning on the power.
(Refer to "1.3.Check on type and specifications".)
*
Metric system is selected for unit.
*
The initial display language is English.
Switch the languages as required.
NG
When Y or C is selected for the 7th digit
Section
Piping parameter setting method
4.6.2
Be careful not to mount the sensor units with wrong mounting
*
dimension.
NG (LED display is red)
Section 6.3
Error and remedy
Contact Fuji Electric's service representative.
Section
Output limit
4.8.1.5
Section
Setting the total
4.8.2
(actual)
Section
DO output
4.8.3
Section
Total pulse output
4.8.3.1
Section
LCD indication
4.8.4
Section
4.9.5.2
Alarm output
Section
Flow switch
4.9.5.3
Section
4.9.5.4
Total switch
-6-
*
Check A, B for the
7th digit of code