Preparation For Operation; Warm-Up Operation And Regular Operation - Fuji Electric ZAF-6 Instruction Manual

Thermal conductivity gas analyzer thermomat
Table of Contents

Advertisement

4. OPERATION

4.1 Preparation for operation

4.1.1 Check of gas sampling tube, exhaust tube and wiring
Check that the pipes are correctly connected to the gas sampling port and drain port. Check that the ana-

4.2 Warm-up operation and regular operation

4.2.1 Operating procedure
About 30 minutes are needed until the operating performance is stabilized. Warm-up operation should
(4) Zero and span calibration
(5) Introduction and measurement of measured gas
16
.
INZ-TN6ZAF-E

Advertisement

Table of Contents
loading

Table of Contents