4. OPERATION

4.1 Preparation for operation

(1) Piping and wiring check
Double-check if piping of the gas sampling and exhaust ports are correctly connected.
Double-check for proper wiring.

4.2 Warm-up operation and regular operation

(1) Operation procedure
1) Turn ON the power switch on the left side when facing the front panel of the analyzer unit.
The measurement screen appears on the front display panel in 1 to 2 seconds.
2) Wait for about 4 hours until the instrument is warmed up.
About 4 hours are required until the instrument allows accurate measurement.
CAUTION
During warm-up, the display indicates midline horizontal bars.
This is not an error.
3) Setting of various set values
Perform the various settings according to Section 6 "Setting and Calibration".
4) Zero calibration and span calibration
Perform zero/span calibration after warm-up operation.
Refer to Section 6.8 "Manual calibration procedure".
5) Introduction and measurement of sample gas
Introduce the sample gas into the analyzer unit before starting measurement.