4. OPERATION

4.1 Preparation for operation

(1) Tube and wiring check

4.2 Warm-up operation and regular operation

(1) Operation procedure
1) Turn ON the power switch on the front panel of the analyzer unit.
The measurement screen appears on the front display panel in 1 or 2 seconds.
2) Wait for about 4 hours until the instrument is warmed up.
CAUTION
When in warm-up, the concentration reading may be beyond.
But, it is not an error.
Perform zero calibration and span calibration after warm-up operation.
5) Introduction and measurement of sampling gas
Introduce the sampling gas into the analyzer unit before starting measurement.
upper limit of range or
lower limit of range.