Mounting Of Detector; Detector Mounting Procedure - Fuji Electric FSJ Instruction Manual

Ultrasonic flowmeter for steam
Table of Contents

Advertisement

Mount the sensor on the pipe, and perform the following steps in order before making measurement.
Ref.
Work item
section
5.1.1

Mounting of detector

5.2
Selecting the mounting location
5.3
Treatment of detector mounting surface : Pretreat the surface of the pipe to which the detector is to be
5.4
Mounting the noise elimination frame
5.5
Sensor mounting bracket mounting
5.6
Sensor mounting
5.7
Pre-anplifier mounting
5.8
Wiring connection
When installing on hot pipes, pay attention to the following items when carrying out installation work. Failure to
observe this may result in burns.
• Keep bare skin away from hot parts. If there is a risk of bare skin coming into contact with hot parts, cover the
skin by wearing gloves, long-sleeves, long pants, and socks, etc.
• Take heat insulation measures if required for work (wearing heat-resistant gloves, etc.).
• Perform a safety check of the area below the installation location to ensure that there are no problems even if
hot objects are dropped by accident.
5. MOUNTING OF DETECTOR

5.1. Detector mounting procedure

: Overview
: Obtain the sensor spacing beforehand.
: Straight pipes are long, and therefore a location with sufficient
work space should be selected.
mounted.
: Mount the noise elimination frame on the pipe.
: Mount the sensor mounting bracket on the pipe.
: Mount the sensor on the sensor mounting bracket.
: Install the pre-amplifier.
: Connect the sensor and pre-amplifier, and the pre-amplifier
and flow transmitter.
-94-

Advertisement

Table of Contents
loading

This manual is also suitable for:

FsxFly

Table of Contents