Installation And Before Start Of Operation Of The Flow Transmitter; Outline Of Installation Procedure - Fuji Electric FLR-3 Instruction Manual

Ultrasonic flowmeter m-flow pw flow transmitter
Table of Contents

Advertisement

2. INSTALLATION AND BEFORE START OF
OPERATION OF THE FLOW TRANSMITTER

2.1. Outline of installation procedure

Install the flowmeter according to the following procedure.
Section 3.2
Installation of flow transmitter
Section 3.3
Flow transmitter wiring
Power ON
Section 4.4
Parameter protection
Checking and
Section 4.6
Specifications/Detector
OK
Section 5
Mounting of
Section 6.5.1.3
Checking the
OK
Displaying the
Section 6.5.2
maintenance mode
Check the data display
AGC U
AGC D
P/H U
P/H D
Section 4.7
Zero Adjustment
Basic operation
Section 4.8
Setting of unit
Section 4.9.1.1
Setting of
range)
Section 4.9.1.2
Setting of
(Burnout)
Application operation
Section 4.9.1
Setting of
Section 4.10.1
Setting automatic
Section 4.10.2
Setting the
Section 4.10.3
Setting the
range
Items to be specified at order
Section 7.3
Run (Measurement)
Section 6
MAINTENANCE AND CHECKUP
Note) Set the parameter protection to OFF before you change settings or perform zero adjustment.
INF-TN3FLR-E
Setting of Piping
When A or B is selected for the
11th digit
detector
NG (LED display is red)
RAS information
(LED display is green)
data in
45% or more
5528 to 6758
Section 4.9.1.3
Section 4.9.2
Section 4.9.3
flow rate range (single
Section 4.9.3.1
analog output at error
Section 4.9.4
flow rate range
Section 4.10.5.2
2 ranges
Bi-directional range
Section 4.10.5.3
Bi-directional auto 2
Section 4.10.5.4
* Check the power supply specifications and wiring before turning on
the power. (Refer to "1.3.Checking the type and specifications".)
* Metric system is selected for unit.
* The initial display language is English. Switch the languages as
required.
NG
When Y or C is selected for the 11th digit
Section 4.6.2
Piping parameter
* Be careful not to mount the sensor units with wrong mounting
dimension. Mount it with the dimension displayed at the process
setting of the piping parameter. (Refer to "5. Mounting of
detector
".)
Displaying the
Section 6.5.2
mode
Check the data display
Section 6.5.6
Checking received
Contact Fuji Electric's service representative.
* Before performing zero point adjustment, check that the pipe is
filled with fluid, the fluid is in still state, and that the measurement
status is normal.
Output limit
Setting the total (actual)
DO output
Setting the
validate the total pulse
How to
output
LCD indication
Setting the
validate the alarm
How to
output
flow switch
Setting the
How to
validate the total
switch
setting method
data in maintenance
AGC U
45% or more
AGC D
P/H U
Outside the range
P/H D
of 5528 to 6758
waveforms
* Check A, B for
the 11th digit of
code symbol
only.
- 5 -