Aisys Installation Checklist - GE Datex-Ohmeda Aisys Carestation Reference Manual

Anesthesia machine
Table of Contents

Advertisement

Aisys

6.1 Aisys Installation Checklist

Serial Number:
Hospital:
6-2
Date: (YY/MM/DD)
Performed by:
1. Unpack and assemble the Aisys System.
2. Reconfigure the sample gas return line as required (TRM - Section 9.23).
3. Access the Installation menu from the Install/Service menu and change
the following as required:
a. Configuration (TRM - Section 4.3.1)
• Decimal Marker
• Language
• Gas Supply Colors
• O
Flowtube
2
• Ventilator Drive Gas
• Altitude
• Gas Outlet
• N
O Enabled
2
b. Units Menu (TRM - Section 4.3.2)
• Weight
• CO
2
• Gas Supply Pressure
• Paw
c. Options List (TRM - Section 4.3.3)
• Check that the factory installed ventilation options match the
configuration purchased with the machine.
d. Copy Configuration Menu (TRM - Section 4.3.4)
• Can be used to save a configuration to a Compact Flash card and
then copy the configuration to additional machines.
e. From the Service Menu select the Service Log Menu
(TRM - Section 4.4.2)
• Review and reset the error and alarm log entries.
f. From the Service Menu select Calibration and perform the following
calibrations (TRM - Section 4.5):
• User Calibration
• Manifold P Span
• Insp Flow Zero
• Insp Flow Valve
• Bleed Resistor
• Paw Span
• Zero Gas Xducers
/
/
04/08 M1046983

Advertisement

Table of Contents
loading

Table of Contents