Test 7
Testing the bellows, the bellows pop-off valve, the bellows base
manifold, and the Bag/Vent switch
1. Separate the Bellows Module from the Circuit Module.
2. Insert appropriate test plugs into the bellows base manifold as shown to
the left.
Note: Position the bellows assembly so that the bellows remain collapsed
as you plug the ports.
Plug
3. Set Bag/Vent switch to Vent.
Plug
4. Position the bellows upright with the bellows collapsed.
5. Connect the Machine Test Tool to the interface ports as shown above.
6. Access the Gas Delivery Schematic (Section 12.3.2) of the Service
Application.
7. Set O
Flow to 0.2 l/min.
2
• Ensure that the Airway Pressure rises to ≥ 30 cm H
8. Set O
Flow to 0.00 l/min.
2
7 Troubleshooting
O.
2
7-21