GE Datex-Ohmeda Aisys Carestation Reference Manual page 201

Anesthesia machine
Table of Contents

Advertisement

M1046983 04/08
Test 5
Testing the APL diaphragm
Plug
APL
Scavenging
Port
Plug
Bag Port
Note
If required, set up the Machine Test Tool and breathing system as shown in
Test 4.
1. Slide the Bellows Module away from the machine.
2. Remove the APL ramp and diaphragm.
3. Insert a Test Plug into the APL scavenging port, as shown above.
4. Slide the Bellows Module partially back onto the machine casting.
5. Ensure that the Bag Port is plugged and that the Bag/Vent switch is set to
Bag.
6. Access the Gas Delivery Schematic (Section 12.3.2) of the Service
Application.
7. Set O
Flow to 0.2 l/min.
2
• Ensure that the Airway Pressure rises to ≥ 30 cm H
Note: If the bellows rises, it indicates a leak in the Bag /Vent Switch.
8. Set O
Flow to 0.00 l/min.
2
7 Troubleshooting
O.
2
7-19

Advertisement

Table of Contents
loading

Table of Contents