Air Compressor

An air compressor may be installed, check the specific weld-deck.
Figure 79: Air Compressor (if installed)
Note: Refer to the Air Compressor Operation Maintenance Manual for detailed operation and maintenance instructions; see
the appendices at the end of the Weld-Deck Operation and Maintenance Manual, Weld-Deck welding package CPW 125-4-
ENSURE THAT ALL

Air Compressor Motor Bearings

Standard grease fittings are provided at each end shield to permit the re-lubrication of the bearings. The lubrication interval,
quantity of grease, and lubrication specification are all stamped on the motor nameplate.
Note: Excessive lubrication, i.e. a quantity of grease greater than that recommended on the motor nameplate, can result in
the increase of bearing temperatures leading to reduced bearing life operating hours.
Bottle Rack – Gas Bottle change
A Bottle Rack may be installed as a front or rear mounted module. The securing straps are divided into separate sets for gas
bottle-pairs. Ensure that all securing straps are tight and that all of the gas bottles are secured. Change gas bottles on level
ground only. When changing gas bottles, only loosen the set of straps used to secure the bottle-pairs that are being changed.
Leave the remaining straps tight to keep the other bottles secure.
Figure 80: Bottle Rack (if installed)
037-08OP-002D-01
S/N CB50600021 – UP (Weld-deck)
Securing
strapsAir
Cleaner
037-05-15-
023A037-05-09-
90

Advertisement

Table of Contents
loading

Related Products for Vanguard CPW 125-4-S Series

Table of Contents