Auto Tie-in Crane Lubrication & Maintenance Schedule
Figure 19: Auto Tie-in Crane Lubrication & Maintenance Schedule

Every 500 Service Hours or 6 months Service

Figure 17
Check the torque on the crane base mounting threaded studs, see
for inspection torque. See the Break-in Period section.

Every 1000 Service Hours or Yearly Service

Check carrier frame below crane base for cracks or damage to the vehicle structure. If any damage noted contact the vehicle
manufacturer or dealer
Refer to the carrier vehicle's Operators Manual.
Refer to the maintenance and lubrication instructions in the Crane manufacture's Owner's manual in Appendix 1 of this manual for
all other crane related maintenance.

Bleeding air from the crane hydraulic system

To purge the air from the boom extension cylinders, lower the boom lift cylinder and cycle the boom extension cylinders in and
out. When the boom extension cylinders are purged cycle the boom lift cylinders raising and lowering the boom to purge the
remaining air from the system. Purging is complete when the system runs smoothly without unusual noise.