Unpacking; Check-In And Configuration - CareFusion Alaris SE User Manual

Table of Contents

Advertisement

Getting Started
1.
Remove instrument from carton.
2.
Plug instrument into an
IMPORTANT:
of
hours prior to use.
24
Maximum battery capacity, as well as gauge accuracy, is
reached after several charge/discharge/recharge cycles in
the refresh process. CareFusion recommends that the
battery be fully charged/discharged/recharged, using the
refresh cycle, before placing the instrument in use.
3.
Perform regular inspections (see Inspection Requirements
on page 116).
See Configurable Settings on page 87 for a list of the
configurable features.
This is a quick reference procedure for check-in and
configuration of new and recently serviced instruments.
Rate Accuracy Qualification Test (Rate Verification)
Set Sensor Check/Pressure Calibration Verification
Functional Test
Flow Stop Test
Ground Current Leakage Test
Ground Resistance Test
Instrument Configuration
User Manual—Alaris SE Pump, Rev2.X
Models 7100/7130, 7200/7230

Unpacking

outlet a minimum
AC

Check-In and Configuration

WARNING
Failure to properly charge the
battery results in an instrument
malfunction. Biomedical personnel
in the facility are responsible for
unpacking the instrument and
ensuring that the battery is fully
charged before placing the
instrument in use.
WARNING
Instruments returned from the
service depot might be set to
factory defaults. Biomedical
personnel in the facility are
responsible for checking in the
instrument and ensuring the current
hospital-approved configurations are
loaded.
CAUTION
Charge the battery for a minimum
of
hours prior to performing the
24
check-in and configuration
procedures. Batteries without a full
charge on initial use might become
damaged and/or cause a
malfunction.
Unpacking
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7100713072007230

Table of Contents