Getting Started
1.
Remove instrument from carton.
2.
Plug instrument into an
IMPORTANT:
of
hours prior to use.
24
Maximum battery capacity, as well as gauge accuracy, is
reached after several charge/discharge/recharge cycles in
the refresh process. CareFusion recommends that the
battery be fully charged/discharged/recharged, using the
refresh cycle, before placing the instrument in use.
3.
Perform regular inspections (see Inspection Requirements
on page 116).
See Configurable Settings on page 87 for a list of the
configurable features.
This is a quick reference procedure for check-in and
configuration of new and recently serviced instruments.
•
Rate Accuracy Qualification Test (Rate Verification)
•
Set Sensor Check/Pressure Calibration Verification
•
Functional Test
•
Flow Stop Test
•
Ground Current Leakage Test
•
Ground Resistance Test
•
Instrument Configuration
User Manual—Alaris SE Pump, Rev2.X
Models 7100/7130, 7200/7230
Unpacking
outlet a minimum
AC
Check-In and Configuration
WARNING
Failure to properly charge the
battery results in an instrument
malfunction. Biomedical personnel
in the facility are responsible for
unpacking the instrument and
ensuring that the battery is fully
charged before placing the
instrument in use.
WARNING
Instruments returned from the
service depot might be set to
factory defaults. Biomedical
personnel in the facility are
responsible for checking in the
instrument and ensuring the current
hospital-approved configurations are
loaded.
CAUTION
Charge the battery for a minimum
of
hours prior to performing the
24
check-in and configuration
procedures. Batteries without a full
charge on initial use might become
damaged and/or cause a
malfunction.
Unpacking
3