Siemens SIMATIC ET 200AL System Manual page 325

Distributed i/o system
Hide thumbs Also See for SIMATIC ET 200AL:
Table of Contents

Advertisement

LED P1 LINK, LED P2 LINK
Table 5- 2
Status displays of the LEDs P1 LINK and P2 LINK
LEDs
P1 LINK
P2 LINK
Off
On
Flashes
LED ET-CON1, LED ET-CON2
Table 5- 3
Status displays of the LEDs ET-CON1 and ET-CON2
LEDs
ET-CON1
ET-CON2
Off
On
IM 157-1 PN (6ES7157-1AB00-0AB0)
Equipment Manual, 05/2021, A5E32347036-AE
Meaning
There is no connection between the
PROFINET interface of your PROFINET de-
vice and a communication partner (e.g., IO
controller).
There is no connection between the
PROFINET interface of your PROFINET de-
vice and a communication partner (e.g., IO
controller).
The "Node flash test" is run (the RUN,
ERROR and MAINT LEDs also flash).
Meaning
There are no I/O modules available at the
respective ET-Connection or the modules
do not have supply voltage.
A communications connection to at least
one IO module at the corresponding ET-
Connection is available.
Interrupts, error messages, diagnostics and system alarms
Check whether the bus cable to the switch
or IO controller is disconnected.
-
-
Check the wiring for the ET-Connection or
the supply voltage for the I/O module.
-
5.1 Status and error displays
Solution
Solution
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents