SECTION 4 - BOOM & PLATFORM

Installation

1. Install the retaining hardware (bolts, nuts, and washers)
and secure the brackets to the platform rail. Tighten the
nuts but do not torque them yet.
2. Attach the fall arrest cable to the right hand bracket
Using the attaching bolt and nut. Orient the bolt as
shown below. Do not tighten the nut so cable can still
rotate.
3. Install the Attachment Ring onto the cable.
4. Without twisting the fall arrest cable, pull it thru the left
hand bracket and mark the top of the swaged cable end.
Install the fall arrest cable through the left hand bracket
and secure it using the belleville washers, washer, retain-
ing nut, and jam nuts. Orient the hardware as shown
below and with the belleville washers so the gap is pres-
ent at the outside diameter of the washers. install the
4-88
BOLT
WASHER
WASHER
NUT
BOLT
NUT
nuts onto the cable finger tight so the mark on the cable
does not move.
WASHER
BELLEVILLE
NUT
WASHER
JAM NUT
5. Use the two jam nuts to prevent the cable from rotating
while the nut is tightened. Tighten the nut until the bel-
leville washers are fully compressed and no gap is pres-
ent at the outside diameter of the washers. Ensure the
cable has not rotated during tightening.
6. Tighten the first jam nut against the retaining nut to
keep the nut from loosening. Tighten the remaining jam
nut against the first jam nut.
7. Torque the nuts and bolts securing the brackets to 15
ft.lbs. (20 Nm).