SECTION 4 - BOOM & PLATFORM
29. Apply a thin coat of moly paste on I.D. of sheave bear-
ings. Coat the bolts with JLG Threadlocker P/N 0100011
and install the sheaves to the front of section 3 using the
pin, keeper, bolt, and washer.
30. Coat the bolts with JLG Threadlocker P/N 0100011.
Install the rope retaining blocks to the front of section 3
using washers, bolts, and nuts.
31. Coat the bolts with JLG Threadlocker P/N 0100011.
Install the front side wear pads to section 3 using wash-
ers, bolts, and shims. Torque the bolts to 28 ft.lbs. (38
Nm).
32. Coat the bolts with JLG Threadlocker P/N 0100011.
Install the front upper wear pads to section 3 using
4-32
washers, bolts, and shims. Torque the bolts to 28 ft.lbs.
(38 Nm))
3121619