Initial System Verification Test Setup

Configure Common Settings

Click the Settings icon at the top of the screen.
Click Global Settings > Output Directory: Select the directory (folder) on the host PC
to which the DPT characterization data gets saved. There is no default path or
folder; you must specify the path.

Hardware Configuration Hardware Tab

Select Settings > Hardware Configuration for Double-Pulse Measurement Control tab.
1 Set and Verify Hardware Configuration.
1. Enter the
oscilloscope's
IP Address
Figure 15 PD1500A Hardware Configuration Screen
Keysight PD500A Double-Pulse Test System Installation Guide
a Select Settings > Hardware Configuration for Double-Pulse Measurement Control
tab. This opens the following Hardware Configuration screen.
b Refer to the PD1500A Control Software Guide for detailed information
about the PD1500A Hardware Configuration.
PD1500A System Verification
Check
2. Click the
Button to verify
communication
with test
instruments.