Site Preparation

Receiving The Rack and Safety Enclosure and Test Instruments

Your DPT Rack and Safety Enclosure shipment arrives in multiple shipping
containers. Before uncrating the Rack and Safety Enclosure or unpacking any
test instrument, carefully inspect the shipping containers for any damage that
may have occurred during shipment such as:
Report any damage to the shipping agent immediately, as such damage is not
covered by the Keysight warranty.
Make sure that all doors, elevators, and passageways in route to the site are
large enough to accommodate the rack and are capable of carrying the weight.
The packaged physical specifications for the racks are listed in the "Rack and
Safety Enclosure Dimensions and Weight" on page 16. Floor elevators and lifting
equipment must be of sufficient capacity. If the rack or other instrument shipping
crate is damaged upon receipt, request that the carrier's agent be present when
the protective covering is removed. Inspect the rack and instruments for damage
(scratches, dents, bent pieces, etc.). If the rack or any instrument is damaged,
notify the carrier and the nearest Keysight Technologies Sales and Service office
immediately.

Moving the Rack and Safety Enclosure

On initial receipt, the Rack and Safety Enclosure exceeds 150 kg (330 lbs). This
does not include the weight and size of the shipping crate.Use a mechanical lift
to lift the shipping crate. The rack has casters for moving it around on a level
floor.
When transporting the Rack and Safety Enclosure for long distances or outside
of a building always make sure that the environmental conditions like humidity,
temperature and air pollution never exceed the related instrument specification.
The temperature should not exceed -20 °C to +60 ° C.
20
– dents
– scratches
– cuts
– water damage

Receiving The Rack and Safety Enclosure and Test Instruments