Gate Resistance Calibration - R G - Keysight PD1500A System Installation Manual

Double-pulse test rack and safety enclosure
Hide thumbs Also See for PD1500A:
Table of Contents

Advertisement

PD1500A Double-Pulse Test System Calibration
Gate Resistance Calibration – R
This step is required when installing custom gate resistors on the High-Side and
Low-Side Gate Drive modules.
Hardware Setup:
Banana - BNC Adapter
Low-Side Gate
Drive Module
Figure 9
Setup for the Gate Resistance Calibration 4-Wire Measurements
Procedure:
After setting up the hardware as described above, click Start to perform the
calibration and continue to the High Voltage Probe Calibration.
68
See Figure 9 below.
– Install the I/NO Jumper on the Low-Side Gate Drive Module.
– Install the V/NC Jumper on the Low-Side Gate Drive Module.
– Refer to Figure 9 below. Install both calibration cables to connect the
B2902A SMU to the Low-Side Gate Drive module.
– The Safety Enclosure hood may be left open.
1251-2277
IMPORTANT: After the R
removed from the Low-Side Gate Drive Module.
There is no calibration for the 0 Gate Drive modules or the
High-Side Gate Drive modules.
System Calibration Procedure (Autocal)
G
8121-2816
BNC - SMA
Cable
I/NO (Normally Open) Jumper.
V/NC (Normally Closed)
Jumper
Calibration, the I/NO jumper must be
G
Keysight Double-Pulse Test System Installation Guide
U1168B Standard Probe Kit

Advertisement

Table of Contents
loading

Table of Contents